Zur Kurzanzeige

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorColón Ramírez, Christian
dc.date.accessioned2024-02-20T19:47:22Z
dc.date.available2024-02-20T19:47:22Z
dc.date.issued2022
dc.identifier.citationColón Ramírez, C. (2022). Production Performance Increase through Five S Technique on Manufacturing Equipment Tools [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2182
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractPharma LLC, a company dedicated to solid drug product manufacturing, performed an assessment and determined they were experiencing overtime cost increases, lower productivity and personnel discomfort with tools and resources available for them to work. To address these issues, the Five S technique was used to minimize equipment downtime, reduce overtime costs, and increase productivity in three manufacturing lines. Several cross functional interviews and feedback sections were held to align on developing and implementing the solution. A shadow board box was implemented on each manufacturing line. This not only allowed to easily find tools within the different areas, but also to identify missing tools and trigger a process to replace if needed. For the process to be maintained, a checklist was added to the daily activities for operations supervisors. The implementation of shadow boards resulted in a reduction of 56.75 hours in equipment downtime over a period of 10 days, overtime cost avoidance of $184K annually and average increase of 15% on productivity for the three manufacturing lines. Key Terms ⎯ Equipment Downtime, Five S, Lean Manufacturing, Process Improvements, Waste Reduction.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesSpring-2022;
dc.relation.haspartSan Juanen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titleProduction Performance Increase through Five S Technique on Manufacturing Equipment Toolsen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Dateien zu dieser Ressource

Thumbnail
Thumbnail

Das Dokument erscheint in:

  • Management
    Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)

Zur Kurzanzeige