The Construction Manager-General Contractor method for construction of transportation projects in Puerto Rico
Resumen
The Transportation infrastructure always needs investment. Fiscal problems at government require the use of innovative solutions
to optimize the use of public funds. The traditional contract method, currently used, increases risks and loss of money. The CM/GC contract method reduces the risks during construction, which enhances project designs. This innovative
contracting method, have good result in other states. The CM/GC was promoted, their implementation was discussed and future projects were identified. If PRHTA makes changes in their code of regulation and obtains the local industry support with a transparent selection method, the CM/GC can be implemented in Puerto Rico with success. Key Terms ⎯ CM/GC; risks reduce;
construction industry; contract innovation.