Zur Kurzanzeige

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorRamos Vega, Luis D.
dc.date.accessioned2024-04-10T19:40:23Z
dc.date.available2024-04-10T19:40:23Z
dc.date.issued2013
dc.identifier.citationRamos Vega, L. D. (2013). Power Plant environmental cleaning schedule optimization [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2386
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractSince switching to natural gas as their primary fuel, the boilers at a power plant of the Puerto Rico Electric Power Authority are kept cleaner and with minimum environmental pollution. According to a consent decreed with the Environmental Protection Agency, the boilers have to be cleaned every 18 months, a standard that was established previously, when the plant was using oil. The purpose of this project is to demonstrate to the Puerto Rico Electric Power Authority that, because it is now using natural gas as primary fuel, their boilers are cleaner and its components are subject to less corrosion, therefore the time between cleanings can be increased from 18 to 36 months. By means of cost analysis, it is demonstrated that there is a considerable amount of money to be saved by extending the time between environmental cleanings. It is also demonstrated that the internal components of the boilers can sustain an extended period of time without service of more than 18 months, but no less than 3 years.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesSpring-2013;
dc.relation.haspartSan Juanen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titlePower Plant environmental cleaning schedule optimizationen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Dateien zu dieser Ressource

Thumbnail
Thumbnail

Das Dokument erscheint in:

  • Management
    Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)

Zur Kurzanzeige