Mostrar el registro sencillo del ítem

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorCollazos, Omaira
dc.contributor.authorMarchand Lujan, Robert A.
dc.date.accessioned2020-09-17T11:57:14Z
dc.date.available2020-09-17T11:57:14Z
dc.date.issued2015
dc.identifier.citationMarchand Lujan, R. A. (2015). Cost effective and fast construction method of the GRS-IBS technology [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/701
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractThe Geosynthetic Reinforced SoilIntegrated Bridge System Technology (GRS-IBS) could reduce cost between twenty five to sixty percent and maybe more from conventional construction method. This report evaluated the cost and time between two bridge projects with comparable characteristics, one using GRS-IBS technology and the other using a conventional bridge construction method. Time and costs from each construction project was gather for analysis purposes. The time of construction using GRS-IBS technology represents a 14% of a total time spent for a conventional bridge construction method and the 21% of the total cost of a conventional construction method. Because this technology needs less equipment, different materials construction, less use of labor and can easily be constructed; provides more advantages than a conventional bridge construction method. Key Terms- Cost Reduction, Easily Fast Construction, Geosynthetic Reinforce Soil (GRS), Integrated Bridge System (IBS).en_US
dc.language.isoen_USen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofCivil Engineering;
dc.relation.ispartofseriesSpring-2015;
dc.relation.haspartSan Juanen_US
dc.subject.lcshBridges--Puerto Rico--Abutments--Design and construction
dc.subject.lcshBridges--Foundations and piers--Design and construction
dc.subject.lcshReinforced soils
dc.subject.lcshGeosynthetics
dc.subject.lcshBridges--Economic aspects
dc.subject.lcshBridges--Cost effectiveness
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Research
dc.titleCost Effective and Fast Construction Method of the GRS-IBS Technologyen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem