Implementation of DMADV in a Body Armor Manufacturing Company
Resumen
The incoming inspection area of a
Body Armor Manufacturing Company is
responsible for ensuring all finished products from
subcontractors meet all customer and internal
requirements. This area has been identified as a
bottleneck for the complete manufacturing facility
and as ineffective in capturing non-conformance to
requirements. After analyzing and implementing the
DMADV methodology the incoming inspection area
improved effectiveness and efficiency clearing all
accumulated material and enhancing internal and
external customer satisfaction. This was achieved
by dividing the effort in four major groups:
requirement flow down, material flow, staffing and
non-conforming material management. After one
year and four months the design proved adequate
and the results reflected a methodical system that
provides an effective barrier for material entering
the manufacturing process and a mechanism to
process non-conforming material minimizing
financial impact.
Key Terms - First in First Out (FIFO),
Material Review Board (MRB), Standard Work
Instructions (SWI), Technical Data Package (TDP).