Buscar
Mostrando ítems 321-330 de 346
Implementing a Compressed Air Leak Preventive and Repair Program
(Polytechnic University of Puerto Rico, 2013)
In recent years the energy cost in Puerto
Rico has been constantly increasing. The reasons
vary from more expensive fuel costs, new
environmental regulations requirements and
inefficiencies in the system. The major ...
Reduction in Dissolution Test Results Variability of A/B Capsule Product
(Polytechnic University of Puerto Rico, 2013)
Since the origins of the agency, the
Food and Drugs Administration (FDA), a scientific,
regulatory, and public health agency had been
dedicated to consumer protection. The FDA,
provides standardized regulations and ...
Reduction of the Vacation Ownership Cancellations in a Hospitality Industry
(Polytechnic University of Puerto Rico, 2014)
Quality loyalty is what all enterprise
aims to have with every customer. Hotel chains
compete to have the best deals for less. In order to
make things different from others, new
implementations have revolutionized the ...
Using Lean Six Sigma Tools to Evaluate Air Travel Delays from Luis Muñoz Marin International Airport in San Juan, P.R.
(Polytechnic University of Puerto Rico, 2014)
There has been an increase in the
demand for air transportation creating more delays
in flights. It is important for Puerto Rico to manage
more efficiently their air transportation to be able
to maintain a continuous ...
Scrap Reduction Evaluation of Filling Equipment and Short-Term Improvement Implementation
(Polytechnic University of Puerto Rico, 2014)
This paper seeks to document an
approach to reduce scrap losses using the Lean Six
Sigma tools for process improvement in a lean
manufacturing environment. The Lean Six Sigma
methodology views lean manufacturing, ...
Aero Repairs Documentation Cycle Time Reduction By Lean Application
(Polytechnic University of Puerto Rico, 2014)
In our daily life and world, with a
diversity of industries and services, from health to
manufacturing, all kind of products; many of them
care apply Lean concepts or tools to perform
important improvements to their ...
Lean Implementation in a Turbocharger Service Shop
(Polytechnic University of Puerto Rico, 2014)
In many of the manufacturing and
repair shops, the use of industrial machinery is
required to perform most production or repair
efforts. A Turbo Service repair shop was identified
due to its needs of Lean tools and ...
Quality Improvement Process for Software Controls in Regulated Industry using Six Sigma Methodology
(Polytechnic University of Puerto Rico, 2013)
A regulated industry at medical
devices company, Software Control practices on
Automated Processes are weak and not
systematized. Several findings were found in past
internal audits related to software revision
changes. ...
Improving Steroid Out Of Specification (OOS) Trending on Pacemaker Lead
(Polytechnic University of Puerto Rico, 2013)
The purpose of this project is to
identify a roots cause and potential factors that
influencing Steroid Out Of Specification Results
(OOS) on pacemaker lead model XYZ. Project
involves Define, Measure, Analyze, Improve ...
First Pass Yield Improvement on Casting Cell Using DMAIC Methodology
(Polytechnic University of Puerto Rico, 2013)
This research project was focused in the
First Pass Yield improvement in a cell of a
Medical Device Company. The first pass yield is
defined as the number of units coming out of a
process divided by the number of units ...