Buscar
Mostrando ítems 61-70 de 1483
Implementation of Innovative Automated Coating Technology in a Medical Device Facility
(Polytechnic University of Puerto Rico, 2012)
Abstract - As part of new products development in a medical device plant, an innovative coating technology known as Physical Vapor Deposition (PVD) will be implemented for the electrode coating process. Current process is ...
Validation of a New Procedure for a Pacemaker Component
(Polytechnic University of Puerto Rico, 2012)
Abstract - Company X manufactures pacemakers in Puerto Rico. Over the past years, Company X has been having a significant amount of complaints due to the septum component contained in its pacemakers. Doctors have claimed ...
Vision System Selection Requirements & Implementation In Industrial Automation
(Polytechnic University of Puerto Rico, 2012)
Abstract - The vision systems are part of a new revolution in automation. With the capability of
being implemented practically to any application, the benefit of using this kind of systems are multiple but the ones which ...
Implementing a Preventive Maintenance to Complement Standards 6.3 and 7.1 of ISO 9001:2008
(Polytechnic University of Puerto Rico, 2012)
Abstract - The recycling process turns materials that would otherwise become waste into valuable resources, and it’s know many companies around the world do this process to produce a raw material that will be used to create ...
Increase Productivity in a Manufacturing Department of a Medical Devices Company
(Polytechnic University of Puerto Rico, 2013)
In all companies the productivity is a
very important metric because is the way to make
sure that we optimize our resources and time. Is the
way to measure if we are manufacturing as
expected and with the required ...
Manufacturing Process Continuous Flow Implementation with Quality Control Inspection and Bill of Material Standardization in a Medical Devices Company
(Polytechnic University of Puerto Rico, 2012)
The Manufacturing Area was composed of seventeen (17) product families around 191 Stock Keeping Units. Most of these families were manufactured in batch mode, while others in continuous flow. This project improved the value ...
The Effect of the Vaporized Hydrogen Peroxide Residues in a Trypticase Soy Agar Plates for a New Barrier Isolated Syringe Filling Machine
(Polytechnic University of Puerto Rico, 2011)
This study has been performed to
evaluate the feasibility and adequacy of the
Trypticase Soy Agar (TSA) plates in promoting
growth after being exposed to Vapor Phase
Hydrogen Peroxide (VPHP) decontamination cycle.
This ...
Hydrologic -Hydraulic Study for an Urban Project Adjacent to a River with no Base Flood
(Polytechnic University of Puerto Rico, 2010)
The massive land development
increases the impervious areas of watershed, which
induces high runoff and downstream flooding
problems especially in areas adjacent to a river. It
is extremely important to determinate a ...
Production Line Improvement Using DMAIC Tool in an Electrical Production Plant
(Polytechnic University of Puerto Rico, 2010)
Today, there is much competition between
the manufacturers of electronics products. This
creates a need for the manufacturers to develop
processes that can supply the client demand within
a required time and a specified ...
Design of a Cleaning Change Over Reduction Strategy for a High Volume Product in a Packaging Line
(Polytechnic University of Puerto Rico, 2010)
Currently packaging operations are
trying to reduce the downtime and operational cost
among others activities to enhance efficiency and
overall process performance. Based on this
objective, pharmaceutical packaging ...