Mostrar el registro sencillo del ítem
Neuromodulator Device Scrap Reduction Using DMAIC Methodology
dc.rights.license | All rights reserved | en_US |
dc.contributor.advisor | González Miranda, Carlos J. | |
dc.contributor.author | Fuentes Cruz, Ismael | |
dc.date.accessioned | 2020-12-15T19:24:05Z | |
dc.date.available | 2020-12-15T19:24:05Z | |
dc.date.issued | 2019 | |
dc.identifier.citation | Fuentes Cruz, I. (2019). Neuromodulator device scrap reduction using DMAIC methodology [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/1002 | |
dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
dc.description.abstract | This research project was focused in the Scrap reduction in a final electrical test area of a medical device company. The scrap is defined as the number of dollars per units resulting from the cost of rejected units coming out of a process divided by the number of units which are released successfully. Only good units (no retest & rework allowed) are counted as coming out of an individual process. In order to reduce the Scrap, the DMAIC methodology was used [1]. DMAIC is an acronym for a series of steps used to measure defects in business processes and improve profitability. The term DMAIC stands for the five main steps in the process: Define, Measure, Analyze, Improve and Control. This research seeks to reduce the Scrap on this manufacturing area where the neuromodulator device is finally verified electrically. This is important for the process because it will reduce unnecessary Scrap related to this false failure. DMAIC methodology brings a structure and the tool to identify and solve the problem. In this case, reduce the Scrap in a medical device company. Key Terms – Cost-Saving, DMAIC, Quality, Scrap. | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | Polytechnic University of Puerto Rico | en_US |
dc.relation.ispartof | Manufacturing Engineering; | |
dc.relation.ispartofseries | Winter-2019; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Six sigma (Quality control standard) | en_US |
dc.subject.lcsh | Product lines | |
dc.subject.lcsh | Medical instruments and apparatus | |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Posters | |
dc.title | Neuromodulator Device Scrap Reduction Using DMAIC Methodology | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Manufacturing Engineering
Artículos de Proyectos de Ingeniería en Manufactura