Show simple item record

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorPons Fontana, Carlos A.
dc.contributor.authorBabilonia Ayala, Orlando
dc.date.accessioned2022-07-26T15:37:19Z
dc.date.available2022-07-26T15:37:19Z
dc.date.issued2010
dc.identifier.citationBabilonia Ayala, O. & Pons Fontana, C. A. (2010). Reduce Scrap Loss of a Pacemaker Lead Applying Lean-Six Sigma. Politechne, 15(1), 7-13.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/1664
dc.descriptionVolumen 15, Número 1, Abril 2010en_US
dc.description.abstractA pacemaker is an electronic device that is placed under the skin to help control abnormal heart rhythms. It consists of a battery, a computerized generator, and lead (wires) with electrodes on one end. in a pacemaker leads manufacturing plant, the loss related to scraps from May 2008 to December 2008 was $81, 223.92. Sleeve Head Assembly was identified as the loss higher generator related to scraps with a total loss of $49, 765 representing a 61% of the total scrap loss. Appling DMAIC methodology from Lean Six-Sigma, the possible causes and action were evaluated. The major cause for the Sleeve Head Assembly scraps is related to leakage at the sleeve head joint. DOE (Design of Experiments) was use to optimize distal & proximal Sleeve Head Bonding. A factorial experiment 2k (for k > 3 Factors) was run to determine the significant factors. The experiment results appoint to prime with adhesive tab 5, use adhesive. Tab 5 for the 360 and one (1) grove layer. A change on manufacturing process was implemented on April 07, 2009 to reduce leakage defect at the sleeve head joint.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofRevista Politechne;
dc.relation.haspartSan Juanen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Undergraduates--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Faculty--Researchen_US
dc.titleReduce Scrap Loss of a Pacemaker Lead Applying Lean-Six Sigmaen_US
dc.typeArticleen_US
dc.rights.holderEsta Junta Editorial y la Universidad Politécnica de Puerto Rico hacen constar y reconoce que los autores de los artículos, obras literarias y artísticas publicadas en esta Revista Politechnê, se reservan enteramente los derechos de autor y de publicación de los mismos para los efectos de cualquier eventualidad literaria, publicitaria o de cualquier índole.en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • Revista Politechnê
    Revista multidisciplinaria de la Universidad Politécnica de Puerto Rico (Vol. 1 | Núm. 1 | Junio 1991 - Vol. 22 | Núm. 1 | 2024

Show simple item record