Recent Submissions

  • Engineering and design application impact on sub-assembly line 

    Vázquez Del Orbe, Grace M. (Polytechnic University of Puerto Rico, 2022)
    A global company producer of medical devices and therapies was under process development of the sub-assembly line #2 for new product introduction and was having a long-time lead time for improved machine replicates drawings ...
  • Improving Change Management of Supplier Changes While Mitigating Supply Chain Risk and Impact on Manufacturing Line 

    Quinones Zayas, Felipe (Polytechnic University of Puerto Rico, 2022)
    Unattended Supplier Change Requests represent a problem for Company XY. The lack of action toward Supplier Changes Requests results in a build-up of open changes that may impact the company's supply chain and manufacturing ...
  • Reducción de Desperdicios Mediante la Eliminación de Filtros en el Área de Pipetas de la Compañía XY 

    Santana Jiménez, Euria W. (Polytechnic University of Puerto Rico, 2022)
    El equipo de calidad de la compañía XY cada día se enfrenta a diferentes tipos de defectos que detienen la producción y crean desperdicios para la compañía. Actualmente, la compañía se encuentra modificando el estándar ...
  • Optimización del proceso constructivo de la primera etapa de una obra de restauración de hormigón 

    Rúa Cortés, Daniela (Polytechnic University of Puerto Rico, 2022)
    En este artículo se identifican y analizan las variables que influyen en un proyecto de restauración de concreto localizado en la ciudad de Coral Gables, cuyo objetivo es optimizar el rendimiento de obra. La metodología ...
  • Chilled Water Plant Energy Upgrade 

    Cabrera Rivera, Cristian I. (Polytechnic University of Puerto Rico, 2022)
    This project was undertaken to increase the efficiency of the cooling equipment at the Nakamura Courthouse in Seattle, WA which is a building that is managed by the General Services Administration (GSA), the government ...
  • Waste Handling Optimization: Operation Cost and Environmental Impact Minimization 

    Marrero Torres, Christopher S. (Polytechnic University of Puerto Rico, 2022)
    The company Eli Lilly established environmental goals to reduce waste and manage resources more effectively. From this, the pharmaceutical site in PR underwent a waste generation evaluation of its current operations, to ...
  • California Based Winery Respiratory Protection Program Cost and Time Reduction Study 

    Márquez Miranda, Carmen del Pilar (Polytechnic University of Puerto Rico, 2022)
    Cost of compliance can be a hidden cost for a firm. This study evaluated a California based winery time and cost of Respiratory Protection Program compliance activities. Time and cost savings were found by digitalization ...
  • Reforma de Tareas para Instalaciones Comerciales con Empleados Rotativos 

    Matos Figueroa, Carlos (Polytechnic University of Puerto Rico, 2022)
    Este proyecto piloto expone los problemas de una instalación comercial sin estructuración operacional. Juncos Plaza, nombre que lleva de pila la instalación, ubicada en mencionado municipio terminada su construcción a ...
  • Damaged cable solution on F-35 electric motor on Aerospace Industry 

    Santos Sánchez, Ariel Enrique (Polytechnic University of Puerto Rico, 2022)
    Broken wires on the electromagnetic motor of the F-35 aircraft is a problem that negatively impacts the production line. Each broken wire defect is equivalent to a loss of $6,000. The major causes of these broken cables ...
  • El impacto en la logística de distribución de Federal Express ante el alza de combustible 

    Torres Ortiz, Aisha M. (Polytechnic University of Puerto Rico, 2022)
    Esta investigación consiste en estudiar el impacto que tiene el alza del combustible en la compañía Federal Express. De conformidad con los estudios previamente realizados, se efectuó un análisis financiero considerando ...
  • Improving micromanagement methods used in a software engineering organization 

    Landron Torres, Adrian A. (Polytechnic University of Puerto Rico, 2022)
    Management groups within businesses are constantly striving to implement new methods of tracking tasks. Micromanagement has become a popular method in modern times because of the level of detail that this method can manage. ...
  • Cost of Quality Reduction in NEMA Coils Assembly Lines 

    Babilonia Obregón, Yari (Polytechnic University of Puerto Rico, 2022)
    The Cost of Quality (COQ) is a proactive cost associated with a prevention investment needed to ensure requirements are met to avoid nonconformances. There are two components to ensure companies meet requirements: internal ...
  • Mejora en el Rendimiento del Proceso de Extrusión del Producto X 

    Alvarez Cruz, Virginia (Polytechnic University of Puerto Rico, 2022)
    A través de este proyecto se buscó mejorar el rendimiento del proceso de extrusión del producto X, el cual es utilizado para tratar cáncer. Extrusión es un proceso de fabricación en el que un material polimérico, enriquecido ...
  • Risk Management Process Improvement 

    Cortés, Roxangely (Polytechnic University of Puerto Rico, 2022)
    The object of this project is an information technology company located in Aguadilla, Puerto Rico. Said company employs the Risk Management process to identify and mitigate potential issues that could become risks as ...
  • Manejo de Personal para Inspección de Daños en las Carreteras 

    Cruzado Ramiro, Rosalinda (Polytechnic University of Puerto Rico, 2022)
    La compañía Roads of PR encontró un problema de atraso en las inspecciones de daños en carreteras, por lo cual se llevó a cabo una búsqueda para verificar la raíz del asunto. La forma en la que se llevaban a cabo las ...
  • Thermoplastic Injection Molding Machine Setup Downtime Reduction 

    Donato Rivera, Roberto Carlos (Polytechnic University of Puerto Rico, 2022)
    Setup is one of the most common downtimes that affects every manufacturing organization. In a molding company, a top offender setup downtime machine (IMM 128) was identified, and a time study of the setup process was ...
  • Multi-Site Spare Part Monitoring Plan at RM Manufacturing Puerto Rico 

    Fernandez Rodriguez, Raul M. (Polytechnic University of Puerto Rico, 2022)
    At RM Manufacturing, increase in downtime was observed due to spare parts unavailability. Spare parts monitoring strategy plays a key role in ensuring a manufacturing plant’s uptime. The objective of this project was to ...
  • El impacto de la energía renovable en las comunidades rurales de la Florida 

    Portillo Ramírez, Raúl J. (Polytechnic University of Puerto Rico, 2022)
    Reducir el gasto monetario del consumo energético mediante el uso de energía renovable, aliviana el bolsillo del consumidor, desde un ahorro de 50% hasta un 100%. Mediante la instalación de paneles solares en dos diferentes ...
  • Rediseño de los procesos de Recobros: Credit Services 

    Lopez Medina, Rafael A. (Polytechnic University of Puerto Rico, 2022)
    Los sistemas y procesos para el grupo de Recobros: Credit Services no habían sido revisados por varios años, lo que provocaba dificultades en los procesos de recobro del grupo. A través del proyecto se logró diseñar un ...
  • Distribución Efectiva de Tareas y Responsabilidades de los Inspectores para Optimizar el Plan de Mantenimiento Preventivo 

    Martínez Feliciano, Omayra (Polytechnic University of Puerto Rico, 2022)
    Este escrito presenta las soluciones recomendadas a la problemática del Directorado de Obras Públicas en una instalación militar. La División de Operaciones y Mantenimiento, la cual es responsable de supervisar el mantenimiento ...