Buscar
Mostrando ítems 171-180 de 192
Managing a Team Without Enough Projects
(Polytechnic University of Puerto Rico, 2016)
This project was focused on a problem that occurred to the military engine performance team at Infotech Aerospace Services (IAS) in Isabela Puerto Rico. The problem assessed consisted on what actions management could take ...
Managing a Team Without Enough Projects
(Polytechnic University of Puerto Rico, 2016)
This project was focused on a problem that occurred to the military engine performance team at Infotech Aerospace Services (IAS) in Isabela Puerto Rico. The problem assessed consisted on what actions management could take ...
Improvement and automation of functional readiness review presentations for an engine program
(Polytechnic University of Puerto Rico, 2016)
The purpose of this project is to automate the generation of the Functional Readiness Reviews (FRR) presentations for the
Pratt & Whitney modeling group’s validation of the State Variable Model for engine control systems. ...
Reduce the overhead cost in On-the-Job training
(Polytechnic University of Puerto Rico, 2016)
The purpose of this research was to identify the missing elements of the On-the-Job training program and to establish a program that covers the employee’s need. Also, specified rules to identify the right instructor to ...
Optimización en el Proceso de Eliminación de Documentos a ser Transferidos fuera de los Estados Unidos
(Polytechnic University of Puerto Rico, 2016)
En el departamento de “International Trade Compliance” de la compañía “Infotech Aerospace Service”, se encontró un proceso en el cual tenía grandes costos operacionales, procesos repetitivos y largas horas de trabajo. ...
Automatic Tank Gauging System: A Next Generation Tool for UST
(Polytechnic University of Puerto Rico, 2015)
A settlement between the United States and Total Petroleum Puerto Rico Corp was agreed to improve leak detection in their gas service stations. The automatic tank gauging with a centralized monitoring system is the method ...
Improvement of Task Tracking to Manage Team Growth
(Polytechnic University of Puerto Rico, 2016)
Monitoring and Control is one of the Project Management (PM) Phases which this project addresses. Proper execution of the
Monitoring and Control phase along with a suitable Task Tracking process helps minimize opportunity ...
Importance of Employee’s Satisfaction
(Polytechnic University of Puerto Rico, 2016)
A high employee’s turnover can be a hard blow to a business, because after investing money and time in a single or a group of
employees, very often they end up jumping to another company. The main cause of this is the ...
Improvement to the quality of software products delivered to the client: Code and documentation
(Polytechnic University of Puerto Rico, 2015)
Elimination of product defects is critical in order to provide quality products to the client. A peer review process and preventive
actions were implemented in a software development department; with the objective to ...
Guideline for Production Ramp-Ups by using a Project Management Approach
(Polytechnic University of Puerto Rico, 2016)
Production Ramp-Ups on manufacturing environment represents one of the biggest challenges on manufacturing environments.
These days, manufacturing environments are very dynamic. Based on the previous mentioned characteristics ...