Buscar
Mostrando ítems 931-940 de 950
Retener al empleado actual
(Polytechnic University of Puerto Rico, 2017)
El propósito de esta literatura es brindar información acerca de retener el empleado actual de alto rendimiento en lugar de substituirlo por uno nuevo. Retener empleados de alto rendimiento es más económico que contratar ...
Redesign of the syringe inspection process
(Polytechnic University of Puerto Rico, 2017)
In the syringe inspection room, the number of units inspected per shift had to be increased. A tool was proposed to increase from 4 to 5 syringes by inspection. Validation of the tool was performed, obtaining satisfactory ...
New Purified Water System for the QC Laboratory
(Polytechnic University of Puerto Rico, 2017)
The project consists of providing the Quality Control Laboratory with a Purified Water supply system to cover the Lab water needs for chemical testing and Laboratory equipment. Currently the laboratory uses water from ...
Reduce the overhead cost in On-the-Job training
(Polytechnic University of Puerto Rico, 2016)
The purpose of this research was to identify the missing elements of the On-the-Job training program and to establish a program that covers the employee’s need. Also, specified rules to identify the right instructor to ...
Optimización en el Proceso de Eliminación de Documentos a ser Transferidos fuera de los Estados Unidos
(Polytechnic University of Puerto Rico, 2016)
En el departamento de “International Trade Compliance” de la compañía “Infotech Aerospace Service”, se encontró un proceso en el cual tenía grandes costos operacionales, procesos repetitivos y largas horas de trabajo. ...
Automatic Tank Gauging System: A Next Generation Tool for UST
(Polytechnic University of Puerto Rico, 2015)
A settlement between the United States and Total Petroleum Puerto Rico Corp was agreed to improve leak detection in their gas service stations. The automatic tank gauging with a centralized monitoring system is the method ...
Improvement of Task Tracking to Manage Team Growth
(Polytechnic University of Puerto Rico, 2016)
Monitoring and Control is one of the Project Management (PM) Phases which this project addresses. Proper execution of the
Monitoring and Control phase along with a suitable Task Tracking process helps minimize opportunity ...
Importance of Employee’s Satisfaction
(Polytechnic University of Puerto Rico, 2016)
A high employee’s turnover can be a hard blow to a business, because after investing money and time in a single or a group of
employees, very often they end up jumping to another company. The main cause of this is the ...
Improvement to the quality of software products delivered to the client: Code and documentation
(Polytechnic University of Puerto Rico, 2015)
Elimination of product defects is critical in order to provide quality products to the client. A peer review process and preventive
actions were implemented in a software development department; with the objective to ...
Guideline for Production Ramp-Ups by using a Project Management Approach
(Polytechnic University of Puerto Rico, 2016)
Production Ramp-Ups on manufacturing environment represents one of the biggest challenges on manufacturing environments.
These days, manufacturing environments are very dynamic. Based on the previous mentioned characteristics ...