Enhancing Monroney Label Process for Efficient Pre-Delivery Inspections
(Polytechnic University of Puerto Rico, 2023)
Motorambar Inc., a prominent player in Puerto Rico's automotive sector, undertook a comprehensive project to refine its
Pre-Delivery Inspection (PDI) process, specifically addressing challenges related to Monroney label ...
Tracking Construction Documents Development Process in an Architecture & Engineering Firm
(Polytechnic University of Puerto Rico, 2021)
A local Architecture & Engineering firm needed to evaluate current option to track the Construction Documents Development Process. They wanted to know what new technologies or strategies are available to reduce production ...
Drug Product Process Development Storage Capacity at Amgen’s AML7x
(Polytechnic University of Puerto Rico, 2021)
The project aimed to increase the storage capacity for the drug product process development team in AM17x building at Amgen.
Storage process and operation improvements were identified through the use of the lean concept. ...
Reducción de ausentismo de empleados en un proyecto de construcción de vía rápida
(Polytechnic University of Puerto Rico, 2021)
Los proyectos de construcción de vía rápida son un modelo de contratación en el que el diseño del proyecto y la ejecución de la obra se realizan casi en forma paralela. A lo largo de dos meses, una empresa de construcción ...
Dominguito Transformer Overload
(Polytechnic University of Puerto Rico, 2023)
Assessments were made in Arecibo, Puerto Rico, between 2021 and 2023 to determine the root cause for loading issues that were occurring in this area. From this investigation, it was found that Dominguito substation has an ...
Desarrollo de un Sistema de Control de Inventario y Mantenimiento de Equipos
(Polytechnic University of Puerto Rico, 2021)
Como parte de la gestión de incorporar equipo dentro de unas nuevas instalaciones, se desarrolló un sistema de control
de inventario y mantenimiento dentro de un almacén de una agencia militar. Las cinco fases de la ...
Past Due Reduction on 37mm Syringe Filters Manufacturing Line
(Polytechnic University of Puerto Rico, 2021)
In Pall Life Sciences Puerto Rico, the past due on the 37mm manufacturing line was at $262,000 and continues increasing. The root cause for this issue is due to a mix of material shortage and customer demand increase. After ...
Diseño de Poste de Iluminación Peatonal Autónomo y Resiliente
(Polytechnic University of Puerto Rico, 2023)
El propósito de este proyecto es el diseño de un sistema de iluminación para aceras autónoma, con enfoqué en las situaciones donde haya fallas en el sistema de provisión de energía eléctrica. Específicamente eventos de ...
Strength Comparison of Flat Roof Solar Panel Mounting Systems
(Polytechnic University of Puerto Rico, 2023)
The trend of installing solar panels in residential buildings has been primarily driven by efforts to lower energy costs, signifying a notable shift towards embracing solar energy solutions. The market offers a wide range ...