Buscar
Mostrando ítems 391-400 de 406
Automatic Tank Gauging System: A Next Generation Tool for UST
(Polytechnic University of Puerto Rico, 2015)
A settlement between the United States and Total Petroleum Puerto Rico Corp was agreed to improve leak detection in their gas service stations. The automatic tank gauging with a centralized monitoring system is the method ...
Improvement of Task Tracking to Manage Team Growth
(Polytechnic University of Puerto Rico, 2016)
Monitoring and Control is one of the Project Management (PM) Phases which this project addresses. Proper execution of the
Monitoring and Control phase along with a suitable Task Tracking process helps minimize opportunity ...
Importance of Employee’s Satisfaction
(Polytechnic University of Puerto Rico, 2016)
A high employee’s turnover can be a hard blow to a business, because after investing money and time in a single or a group of
employees, very often they end up jumping to another company. The main cause of this is the ...
Improvement to the quality of software products delivered to the client: Code and documentation
(Polytechnic University of Puerto Rico, 2015)
Elimination of product defects is critical in order to provide quality products to the client. A peer review process and preventive
actions were implemented in a software development department; with the objective to ...
Guideline for Production Ramp-Ups by using a Project Management Approach
(Polytechnic University of Puerto Rico, 2016)
Production Ramp-Ups on manufacturing environment represents one of the biggest challenges on manufacturing environments.
These days, manufacturing environments are very dynamic. Based on the previous mentioned characteristics ...
Harbor Access Road Stabilization Design Project
(Polytechnic University of Puerto Rico, 2016)
Many location of shoreline erosion have been identified in the United States coast and their territories. AES Puerto Rico Harbor
road has eroded and created unstable soil conditions. The California Department of Public ...
Optimization of Drawing Redaction Tasks
(Polytechnic University of Puerto Rico, 2016)
New services always provide new revenues for a company, but more often than not, these services need to be optimized. Utilizing tools from the Lean Manufacturing toolbox, like Lean Inventory and First-In First-Out queue ...
Prognostics and Health Management Optimization for Commercial Engines
(Polytechnic University of Puerto Rico, 2016)
The purpose of this project was to determine an existing problem within the work environment of each individual user. During the
duration of the project a process improvement initiatives were implemented by using their ...
Mejoras en la Preparación y Entrega de los Chucks a las Líneas de Empaque
(Polytechnic University of Puerto Rico, 2017)
Durante el proceso de cambio de las líneas de empaque, específicamente en la estación de la tapadora, se requiere el cambio de los “chucks” según el tamaño de la tapa a utilizarse. Luego de realizado el cambio, se generan ...
Environmental Operation Area (EOA) Automation Project-Control Systems Improvements
(Polytechnic University of Puerto Rico, 2017)
Since April thru July 2017, it was reported that the downtimes and cycle times at the Environmental Operation Area of a manufacturing plant had increased, since the instrument and control systems are highly degraded. In ...