Listar Design Project Articles Master Degree por título
Mostrando ítems 645-664 de 1486
-
Improve Conformal Coat On-Time Delivery
(Polytechnic University of Puerto Rico, 2017)The Conformal Coat area throughput time is 37 hours on average when their limit established by the business is 24 hours. This low performance is negatively impacting the on-time delivery metric for internal and external ... -
Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project
(Polytechnic University of Puerto Rico, 2022)The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS ... -
Improve Major Changeover Procedure in MK0431AR Coating Area
(Polytechnic University of Puerto Rico, 2013)Today, most plants are running multiple products per line per day, including varieties of the same products, requiring many changeovers with the intense pressures to boost production efficiency, meet increasing consumer ... -
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ... -
Improve service and efficiency of LAL kinetic chromogenic method for a combine manufacturing product
(Polytechnic University of Puerto Rico, 2018)A new supplier is now validated according to the requirements on the USP <85> Bacterial Endotoxin Test, USP <161>, ANSI/AAMI ST72:2011. This validation is conducted in order to comply with manufacturing and customer ... -
Improve the Cycle Time of Stat Testing in Quality Control Laboratory Applying Kaizen Analysis
(Polytechnic University of Puerto Rico, 2013)Quality Control Laboratory of Biopharma Company was selected for develop a design project, using the technique of Kaizen Project. Manufacturing area of Biotech Company produces a biological product. Biologic Bulk ... -
Improve The Effectiveness And Efficiency Of Organizational Processes At Challenge Fitness Studio
(Polytechnic University of Puerto Rico, 2021)This project focuses on the implementation of company improvements using engineering tools. The Challenge Fitness Studio organization's based improvement process was analyzed. The main focus of the project focuses on the ... -
Improve the Lay-Up Process by Reducing 15% of the Documentation Errors within Six Months using Kaisen and/or DMAIC Six Sigma Tool
(Polytechnic University of Puerto Rico, 2018)From August 2017 to October 2017 (3Q2017) the documentation errors (including layup errors and mixed styles) were 96% average in one Distribution Center at the west coast. DMAIC methodology was applied including lean ... -
Improve Yield of the Replication Line for DVD9/DVD5 for a Technology Company
(Polytechnic University of Puerto Rico, 2012)Abstract ⎯ Replication process is used to mold the disc via injection molding, this process is used for high volume runs due to process stability. Currently the yield of the replication line is around 85-90%, the objective ... -
Improvement and automation of functional readiness review presentations for an engine program
(Polytechnic University of Puerto Rico, 2016)The purpose of this project is to automate the generation of the Functional Readiness Reviews (FRR) presentations for the Pratt & Whitney modeling group’s validation of the State Variable Model for engine control systems. ... -
Improvement and Design of a Kitchen Using DMADV Methodology
(Polytechnic University of Puerto Rico, 2023)This design project will focus on remodeling a kitchen for an elderly person. The kitchen that is going to be remodeled has a peninsula or G-shaped layout design. The new design that will be introduced aims to save time ... -
Improvement and Integration in High Efficiency Equipment to Reduce Energy Cost
(Polytechnic University of Puerto Rico, 2016)The application of improved models of energy management is vital, because it generates continuous improvement, optimizes energy efficient and strengthens the culture of preservation. Incorporating Energy Efficiency aims ... -
Improvement in the Army’s Support Storage Activity
(Polytechnic University of Puerto Rico, 2023)The lack of efficiency in the turn-in and shipping sections are some of the issues that are affecting the fiscal budget of the Army’s Support Storage Activity (SSA) in Ft. Buchanan. The main causes of these problems are ... -
Improvement in the Inventory System and How to Reduce Waste
(Polytechnic University of Puerto Rico, 2023)Due to the recent pandemic, industries have confronted inventory problems because of all the backorders that exist with the suppliers. Consequently, industries have lacked the necessary materials to continue their processes. ... -
Improvement in the Utilization of the Utilities Operator’s in a Pharmaceutical Industry in Puerto Rico
(Polytechnic University of Puerto Rico, 2013)Personnel's motivation, performance and accuracy to execute their duties are important part impacted by unbalanced workload and insufficient number of resources. The evaluation of resources and balance workloads are ... -
Improvement in the Visibility of Nonconforming Product Inventory and Reduction
(Polytechnic University of Puerto Rico, 2022)One of the major problems reported in a company is the Nonconforming product inventory, reducing the availability to use space for new production lines and storage of conforming product. Company wants to understand why the ... -
Improvement of a Public Utility Authority Complaint Responding System
(Polytechnic University of Puerto Rico, 2012)Abstract - This project will be conducted in the Operations Department of a Public Utility Authority. The project will focus on the improvement of the agency complaints respond service. The Six Sigma DMAIC model was used ... -
Improvement of acquisition strategies and employee satisfaction between multiple companies
(Polytechnic University of Puerto Rico, 2022)In the United States, various mergers especially those with engineering applications, have been notoriously unsuccessful compared to other industries. The purpose of this project is to eradicate two of the most common ... -
Improvement of Certification Review Documents Process
(Polytechnic University of Puerto Rico, 2017)The purpose of this project was to improve the Certification Documents Review Process for the Certification Software Release Reports. The process performed by Pratt and Whitney’s Next Generation Product Family group is ... -
Improvement of Contact Lens Field Complaint Rate Using the DMAIC Approach
(Polytechnic University of Puerto Rico, 2009)Contact lenses are susceptible to a defect call “tearing”. This is common but seldom condition detected in the field by the customer. The manufacturing process of a contact lens is a very precise method of combining ...