Reduction and mitigation of foreign matter observed in product ABC
(Polytechnic University of Puerto Rico, 2020)
During the past three years, a manufacturing company for medical devices on the west side of Puerto Rico has been in the need of evaluating and mitigating the causes behind an increase in complaint incidents reported due ...
Incrementar la capacidad de producción manufacturera en el interruptor residencial auto Q una pulgada
(Polytechnic University of Puerto Rico, 2020)
Recientemente la compañía ABB adquirió la división de GE Industrial Solution con la misión de ganar una mayor participación en el mercado de las Américas. A inicios del tercer trimestre del año 2020 el volumen de producción ...
Supplier Request (SR) Process Streamline and Optimization
(Polytechnic University of Puerto Rico, 2020)
The Supplier Request (SR) process is used by the supply base to electronically submit Process or Engineering change requests against the contractual relationship or approved technical baseline. The process is not optimized ...
Reducción de Costos de Piezas de Repuesto y Maximización del Taller Mecánico
(Polytechnic University of Puerto Rico, 2020)
El encargado de la supervisión del área de Mantenimiento, Almacén de piezas de Repuesto y Taller Mecánico de una industria de
instrumentos médicos tiene el presupuesto limitado para la operación del departamento. El ...
Data Center Monitoring System Upgrade
(Polytechnic University of Puerto Rico, 2020)
The project was developed at the Headquarters of the Defense Commissary Agency (DeCA), located at Fort Lee, Virginia, that
operates nearly 240 commissaries worldwide. The Agency’s data center was experiencing a high ...
Obsolescence Management- Unknown Parts
(Polytechnic University of Puerto Rico, 2020)
In an aerospace program, an opportunity to improve the obsolescence process was identified. The DMAIC methodology was
implemented. The Bill of Materials was evaluated and it was found that there are parts with Unknown ...
Streamlining Multi-Departmental Coordination for Timely Healthcare Facility Launch
(Polytechnic University of Puerto Rico, 2023)
This paper addresses the formidable challenge of establishing a new primary care facility in response to the healthcare needs of a 5,000- member community in Florida within a stringent one-year timeframe. The synchronization ...
Propuesta de mejora de abastecimiento, gestión de inventario y procesos operativos del almacén de materiales de empaque en César Iglesias, S.A.
(Universidad Politécnica de Puerto Rico, 2020)
La falta de espacio y grandes cantidades de materiales en el Almacén de Empaques en César Iglesias S.A. son un problema importante para la Dirección de Cadena de Suministro. Algunas de las causas principales es la falta ...
Feasibility Study for the Production of an Outdoor-Rated Energy Storage System
(Polytechnic University of Puerto Rico, 2023)
The objective of this project was to determine the feasibility of introducing an outdoors-rated Energy Storage System (ESS) as a
new product offering from a company. The two drivers for determining the feasibility were ...
Tiempo proyectado para la construcción residencia familiar Mariela
(Universidad Politécnica de Puerto Rico, 2020)
Este proyecto busca reducir un 20% el tiempo proyectado en la construcción de una casa de un nivel con 138 m2, el cual no tiene un cronograma de trabajo. Se utilizó la técnica de revisión y evaluación de programa y el ...