Buscar
Mostrando ítems 21-27 de 27
Time Cycle Reduction of the Scrap Process in a Medical Device Company
(Polytechnic University of Puerto Rico, 2011)
As part of an assessment performed for continuous improvement it was identified that the Nonconformance (NC) Timeline metric shows 23% over the goal of 30 days closure. From the list of NC Reports (NCR) impacting this ...
An Application of Project Management Methodology for the Development of an Advance Identity Product within Budget and On Time Delivery
(Polytechnic University of Puerto Rico, 2012)
Abstract - In an Advanced Identity Management Technology Company the purpose is to create solutions to identifying individuals in a system (such as a country, a network, or an enterprise) and controlling their access to ...
Improve Yield of the Replication Line for DVD9/DVD5 for a Technology Company
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ Replication process is used to mold the disc via injection molding, this process is used for high volume runs due to process stability. Currently the yield of the replication line is around 85-90%, the objective ...
Reduction of Time in a Manufacturing Process for a Pharmaceutical Company Located in Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Abstract - The project is developed in a chemical plant of a pharmaceutical company in Puerto Rico. In 2011 the company had an increase in market demand of the active ingredient of one product. To ensure the profit plan, ...
Reducing Documentation Errors by Designing a Continuous Workflow for the In-Process of Spinal Needles
(Polytechnic University of Puerto Rico, 2022)
Good Documentation Practices are essential to maintain a robust Quality System. Many documentation errors were constantly found on acceptance records at the Product Release-to-Packaging stage. ...
Optimizing an Airplane Generator in the Manufacturing Stage
(Polytechnic University of Puerto Rico, 2022)
Developing an airplane generator is an engineering challenge that takes planning, designing, brainstorming and, manufacturing of the final design. After all the planning is done, the manufacturing process sequence is ...
Handling and Managing of Vial Rejects
(Polytechnic University of Puerto Rico, 2021)
A large accumulation of filled vial
rejects generated in an aseptic filling line of a
parenteral medication was identified to be in the
custody of the Quality Assurance department
indefinitely. Using the DMAIC methodology ...