dc.rights.license | All rights reserved | en_US |
dc.contributor.advisor | Nieves Castro, Rafael A. | |
dc.contributor.author | Madrigal Negrón, Pamela | |
dc.date.accessioned | 2020-08-05T11:31:28Z | |
dc.date.available | 2020-08-05T11:31:28Z | |
dc.date.issued | 2012 | |
dc.identifier.citation | Madrigal Negrón, P. (2012). Workmanship error at assembly line in a medical device company [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/485 | |
dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
dc.description.abstract | Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. The Failure per Million is 205, the goal for the year is 180, and the objective is a 15% of reduction. These failures impact the company to comply with International Organization for standard (ISO) 13485. To be certified by ISO the manufacture shall demonstrate that investigations are made for each non conformance reported. If an increase is observed it is management responsibility to assure defects are attended and corrective and preventive actions will be generated. The methodology used to obtain a reliable production line was DMAIC (Define, Measure Analyze, Improve and Control). The projects mayor improvement is a new systematic visual aid procedure Process Picture Mapping which would be implemented further to the entire company.
Key Terms - DMAIC, PFMEA, Poka Yoke, PPM. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Polytechnic University of Puerto Rico | en_US |
dc.relation.ispartof | Manufacturing Engineering; | |
dc.relation.ispartofseries | Spring-2012; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Six sigma (Quality control standard) | en_US |
dc.subject.lcsh | Lean manufacturing | en_US |
dc.subject.lcsh | Medical instruments and apparatus industry--Management | en_US |
dc.subject.lcsh | Medical instruments and apparatus industry--Quality control | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | |
dc.title | Workmanship Error at Assembly Line in a Medical Device Company | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |