Zur Kurzanzeige

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorNieves Castro, Rafael A.
dc.contributor.authorMadrigal Negrón, Pamela
dc.date.accessioned2020-08-05T11:31:28Z
dc.date.available2020-08-05T11:31:28Z
dc.date.issued2012
dc.identifier.citationMadrigal Negrón, P. (2012). Workmanship error at assembly line in a medical device company [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/485
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractAbstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. The Failure per Million is 205, the goal for the year is 180, and the objective is a 15% of reduction. These failures impact the company to comply with International Organization for standard (ISO) 13485. To be certified by ISO the manufacture shall demonstrate that investigations are made for each non conformance reported. If an increase is observed it is management responsibility to assure defects are attended and corrective and preventive actions will be generated. The methodology used to obtain a reliable production line was DMAIC (Define, Measure Analyze, Improve and Control). The projects mayor improvement is a new systematic visual aid procedure Process Picture Mapping which would be implemented further to the entire company. Key Terms - DMAIC, PFMEA, Poka Yoke, PPM.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManufacturing Engineering;
dc.relation.ispartofseriesSpring-2012;
dc.relation.haspartSan Juanen_US
dc.subject.lcshSix sigma (Quality control standard)en_US
dc.subject.lcshLean manufacturingen_US
dc.subject.lcshMedical instruments and apparatus industry--Managementen_US
dc.subject.lcshMedical instruments and apparatus industry--Quality controlen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Research
dc.titleWorkmanship Error at Assembly Line in a Medical Device Companyen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Dateien zu dieser Ressource

Thumbnail

Das Dokument erscheint in:

Zur Kurzanzeige