Buscar
Mostrando ítems 31-40 de 271
Minimizing Subscriptions and Financial Losses by Implementing and Improving Quality Process in Radio Base Stations
(Polytechnic University of Puerto Rico, 2015)
There has been an increase in the
wireless phone services. It is important for
telecommunications companies to manage more
efficiently their operations and equipments to be
able to maintain a continuous service and ...
Parenterals Vial Manufacturing Filling Area Yield Improvement Project
(Polytechnic University of Puerto Rico, 2015)
In the Parenterals Pharmaceutical
industry a quality, financial and manufacturing
measure of how the process is being operated and
that measures the appropriate use of materials,
excipients, and active product ingredients ...
Implementation of Risk Assessment Tool for the Standardization of Training Methodology and Learning Assessments of Standard Operating Procedures in a Pharmaceutical Plant
(Polytechnic University of Puerto Rico, 2015)
The Food and Drug Administration
requires that pharmaceutical companies submit to
regular on-site inspections and product monitoring,
and that they reveal the methods used in clinical
trials proving drug efficacy. ...
Metrics for Business Performance Management
(Polytechnic University of Puerto Rico, 2015)
Business Metrics are very useful tools
to promote business performance, assure quality
and promote continuous improvement. During
economic recession the application of these tools
becomes imperative to assure business ...
Design a One-Piece Flow System in a Casket Manufacturing Company
(Polytechnic University of Puerto Rico, 2015)
The competition between Casket
companies is increasing every day. Many casket
companies are importing products from China and
Mexico. The customers are greatly influenced by
prices. To be competitive, the industry is ...
Implementation of DMADV in a Body Armor Manufacturing Company
(Polytechnic University of Puerto Rico, 2014)
The incoming inspection area of a
Body Armor Manufacturing Company is
responsible for ensuring all finished products from
subcontractors meet all customer and internal
requirements. This area has been identified as ...
Fill and finish Production Line End Effectors Improvements for Reducing Rejected Units due to Robot Pickup Failures
(Polytechnic University of Puerto Rico, 2014)
Since the production of parenteral is
more regulated and complicated, it makes the
manufacture investment cost higher in comparison
with other dosage forms. As result, is important to
apply lean tools in order to reduce ...
Reducción de defectos visuales en lentes de contacto: Utilizando la Metodología DMAIC
(Polytechnic University of Puerto Rico, 2014)
La crisis económica ha tenido un
gran impacto sobre la actividad industrial. La
industria de dispositivos médicos dedicados a la
manufactura de lentes de contacto no ha sido la
excepción. En busca de lidiar con esta ...
Using Lean Six Sigma Tools to Evaluate Air Travel Delays from Luis Muñoz Marin International Airport in San Juan, P.R.
(Polytechnic University of Puerto Rico, 2014)
There has been an increase in the
demand for air transportation creating more delays
in flights. It is important for Puerto Rico to manage
more efficiently their air transportation to be able
to maintain a continuous ...
The Stabilization of an Atmosphere of Plasma Based Carbon Dioxide at Atmospheric Pressure
(Polytechnic University of Puerto Rico, 2014)
Some reasons are discussed for the
stabilization of a glow discharge at atmospheric
pressure which was attained by controlling the
following three conditions: the use of a highfrequency source, the use of gas for dilution ...