Suppliers Information Exchange Process Optimization
(Polytechnic University of Puerto Rico, 2018)
The emphasis of this research project
is to reduce the processing time for supplier’s
requests for change and/or information (RC/I), a
tool utilized to request information and/or change
in response to technical or ...
Aero Repairs Documentation Cycle Time Reduction By Lean Application
(Polytechnic University of Puerto Rico, 2014)
In our daily life and world, with a
diversity of industries and services, from health to
manufacturing, all kind of products; many of them
care apply Lean concepts or tools to perform
important improvements to their ...
Diseño de Optimización en el Proceso de Diseño en el Área de Moldeo por Inyección
(Polytechnic University of Puerto Rico, 2017)
Mediante el uso de la metodología de
Lean se reduce el tiempo de diseño y al mismo
tiempo se eleva la calidad de producto que se hace
en los moldes de inyección. Este método se aplicará
haciendo una implementación de ...
Cycle Time Reduction of a Crystallization Process in a Chemical Plant
(Polytechnic University of Puerto Rico, 2013)
Estimates indicate that Diabetes will
increase affecting the population worldwide in the
future. To mitigate current and future demand,
Barceloneta’s Factory 2 needs to improve the
active pharmaceutical ingredient (API) ...
Stack and Bond Automation for Rotor and Stator Cores Manufacturing Application
(Polytechnic University of Puerto Rico, 2013)
The manufacturing process for the core
of the electric motors or electric generators starts
with the stacking process of core. The main
objective in this project is to reduce the
manufacturing time and improve the ...
Mejora en el Proceso de Limpieza en los Equipos de Manufactura
(Polytechnic University of Puerto Rico, 2022)
Durante estudios de tiempo en los procesos en una farmacéutica en Puerto Rico se identificó un tiempo prolongado en la ejecución de limpieza de la Compresora que es compartida con varios productos .Por esta razón ...
Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project
(Polytechnic University of Puerto Rico, 2022)
The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS ...
Production Improvement for Manufacturing Furniture Company
(Polytechnic University of Puerto Rico, 2020)
This project was based on the
laminating production improvement for a
manufacturing furniture company. Basically, the
process consists of the laminated production of wood
materials. The lead time and ship dates of ...
Equipment Validation Standardization for Project Implementation Time Reduction of Automated Manufacturing Platforms
(Polytechnic University of Puerto Rico, 2012)
Abstract - Medical Device regulated industry requires extensive validation work. Using the latest automation technology for the process equipment to eliminate the operator interaction brings the challenge of how fast the ...
Material Qualification Process Improvement to Reduce the Cycle Time
(Polytechnic University of Puerto Rico, 2019)
This project was focused in improving
the material qualification process, reducing the
cycle time. A Documentation Checklist and Tracking
Sheet System were created as part of the
improvements. The Documentation Checklist ...