• español
    • English
    • Deutsch
  • English 
    • español
    • English
    • Deutsch
  • Login
View Item 
  •   PRCR Home
  • Polytechnic University of Puerto Rico
  • Design Project Articles Master Degree
  • Manufacturing Engineering
  • View Item
  •   PRCR Home
  • Polytechnic University of Puerto Rico
  • Design Project Articles Master Degree
  • Manufacturing Engineering
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

CSV Program Implementation using a Risk Based Approach to align ICH with GAMP5

Thumbnail
View/Open
Articulo Final_Hiramdie Miranda (576.2Kb)
Date
2016
Author
Miranda Narváez, Hiramdie
Metadata
Show full item record
Abstract
it has been 29 years when Process Validation was created. Since then there has been a lot of creations of different types of validations. During the years there have been a lot of improvements in every validation process. Different kind of process has been created to support validations. Quality is an important factor in any process nowadays. In this project we want to align a Quality Risk Management process like ICH Q9 with GAMP5 Computerized Systems Validation process. A DMAIC problem solving method was used to identify gaps between processes and provide a clear view to resolve the problems.in conclusion the best way to align these processes is to begin with a full risk assessment, risk control and continue with the GAMP5 process. Key Terms - Computer Systems Validation, GAMP5, ICH Q9, Quality Risk Management, Risk Assessment.
URI
http://hdl.handle.net/20.500.12475/592
Collections
  • Manufacturing Engineering

PRC Repository copyright © 2022  COBIMET, Inc.
Contact Us
Theme by 
Atmire NV
 

 

Browse

All of PRCRCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Statistics

View Usage Statistics

PRC Repository copyright © 2022  COBIMET, Inc.
Contact Us
Theme by 
Atmire NV