dc.identifier.citation | Marchand Lujan, R. A. (2015). Cost effective and fast construction method of the GRS-IBS technology [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/701 | |
dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
dc.description.abstract | The Geosynthetic Reinforced SoilIntegrated Bridge System Technology (GRS-IBS)
could reduce cost between twenty five to sixty
percent and maybe more from conventional
construction method. This report evaluated the cost
and time between two bridge projects with
comparable characteristics, one using GRS-IBS
technology and the other using a conventional
bridge construction method. Time and costs from
each construction project was gather for analysis
purposes. The time of construction using GRS-IBS
technology represents a 14% of a total time spent for
a conventional bridge construction method and the
21% of the total cost of a conventional construction
method. Because this technology needs less
equipment, different materials construction, less use
of labor and can easily be constructed; provides
more advantages than a conventional bridge
construction method.
Key Terms- Cost Reduction, Easily Fast
Construction, Geosynthetic Reinforce Soil (GRS),
Integrated Bridge System (IBS). | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | Polytechnic University of Puerto Rico | en_US |
dc.relation.ispartof | Civil Engineering; | |
dc.relation.ispartofseries | Spring-2015; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Bridges--Puerto Rico--Abutments--Design and construction | |
dc.subject.lcsh | Bridges--Foundations and piers--Design and construction | |
dc.subject.lcsh | Reinforced soils | |
dc.subject.lcsh | Geosynthetics | |
dc.subject.lcsh | Bridges--Economic aspects | |
dc.subject.lcsh | Bridges--Cost effectiveness | |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | |
dc.title | Cost Effective and Fast Construction Method of the GRS-IBS Technology | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |