Mostrar el registro sencillo del ítem
Downtime Reduction Driven by Evaluation of Material Unavailability
dc.rights.license | All rights reserved | en_US |
dc.contributor.advisor | Torres, Edgar | |
dc.contributor.author | Rivera Garcia, Danny | |
dc.date.accessioned | 2020-09-17T12:29:34Z | |
dc.date.available | 2020-09-17T12:29:34Z | |
dc.date.issued | 2014 | |
dc.identifier.citation | Rivera Garcia, D. (2014). Downtime reduction driven by evaluation of material unavailability [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/713 | |
dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
dc.description.abstract | In the manufacturing & life-sciences industry, increased competition has forced a cost-reduction philosophy in what was once a highly profitable business. Manufacturers now need to maintain or improve time to market and quality while keeping low costs. For this reason, manufacturing firms are now focusing on improving their processes to reduce sources of waste, including the waste of downtime in manufacturing processes. When a manufacturing process stops for an unplanned event it creates downtime. It is particularly important to define the difference between downtime and small process interruptions. For this design project, we define downtime as any unplanned stop that is five minutes or longer. For most manufacturers downtime is the single largest source of lost production time. It receives a high level of attention if productivity is affected due to material unavailability, especially when they estimate their downtime or manually record downtimes for each occurrence. This paper presents the process improvement using the DMAIC approach. DMAIC proved to be the most preferred technique for the defect identification and process improvement by use of various tools. As a result, the efficiency of the process will increase by the reduction of downtime up to 20%. Key Terms - Downtime, DMAIC, Lean Manufacturing, Six Sigma | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | Polytechnic University of Puerto Rico | en_US |
dc.relation.ispartof | Manufacturing Engineering; | |
dc.relation.ispartofseries | Winter-2014; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Six sigma (Quality control standard) | |
dc.subject.lcsh | Manufacturing industries--Quality control | |
dc.subject.lcsh | Manufacturing processes | |
dc.subject.lcsh | Production management | |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | |
dc.title | Downtime Reduction Driven by Evaluation of Material Unavailability | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Manufacturing Engineering
Artículos de Proyectos de Ingeniería en Manufactura