dc.rights.license | All rights reserved | en_US |
dc.contributor.advisor | Morales Morales, José Alberto | |
dc.contributor.author | Acevedo Colón, Gabriel | |
dc.date.accessioned | 2023-09-15T00:27:51Z | |
dc.date.available | 2023-09-15T00:27:51Z | |
dc.date.issued | 2023 | |
dc.identifier.citation | Acevedo Colón, G. (2023). Standardization Times in a Blending (Flex 2 Unit Operation) Manufacturing Process [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/1958 | |
dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
dc.description.abstract | The continuous evolution in standardization, digitalization, and changes in the ways of working in manufacturing in the
pharmaceutical industry and the increase in production for product X by 2023, has made it necessary to study the work process and standardize the blending production unit of the Flex 2 production area. The Flex 2 area is dedicated to a single product only. For the preparation of the drug, the area of Flex 2 performs 2 different types of API mixing, since the drug in its final stage of
compression is a Bi-layer tablet. The blending process requires standardizing the number of operators needed to execute the batches and the number of batches that can be manufactured in the Flex 2 Blending unit. In 2022, a total of 610 batches were processed and the average batch cycle time was 7.0hrs. Key Terms - Blending, Cycle Time, Lean Manufacturing, Standardization Times. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Polytechnic University of Puerto Rico | en_US |
dc.relation.ispartof | Manufacturing Competitiveness; | |
dc.relation.ispartofseries | Spring-2023; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Posters | en_US |
dc.subject.lcsh | Mixing | en_US |
dc.subject.lcsh | Lean manufacturing | |
dc.subject.lcsh | Time management | |
dc.title | Standardization Times in a Blending (Flex 2 Unit Operation) Manufacturing Process | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |