Buscar
Mostrando ítems 291-300 de 407
Drug Product Process Development Storage Capacity at Amgen’s AML7x
(Polytechnic University of Puerto Rico, 2021)
The project aimed to increase the storage capacity for the drug product process development team in AM17x building at Amgen.
Storage process and operation improvements were identified through the use of the lean concept. ...
Reducción de ausentismo de empleados en un proyecto de construcción de vía rápida
(Polytechnic University of Puerto Rico, 2021)
Los proyectos de construcción de vía rápida son un modelo de contratación en el que el diseño del proyecto y la ejecución de la obra se realizan casi en forma paralela. A lo largo de dos meses, una empresa de construcción ...
Dominguito Transformer Overload
(Polytechnic University of Puerto Rico, 2023)
Assessments were made in Arecibo, Puerto Rico, between 2021 and 2023 to determine the root cause for loading issues that were occurring in this area. From this investigation, it was found that Dominguito substation has an ...
Desarrollo de un Sistema de Control de Inventario y Mantenimiento de Equipos
(Polytechnic University of Puerto Rico, 2021)
Como parte de la gestión de incorporar equipo dentro de unas nuevas instalaciones, se desarrolló un sistema de control
de inventario y mantenimiento dentro de un almacén de una agencia militar. Las cinco fases de la ...
Past Due Reduction on 37mm Syringe Filters Manufacturing Line
(Polytechnic University of Puerto Rico, 2021)
In Pall Life Sciences Puerto Rico, the past due on the 37mm manufacturing line was at $262,000 and continues increasing. The root cause for this issue is due to a mix of material shortage and customer demand increase. After ...
The Feasibility of Installing a Green Roof System to Mitigate Large Water Runoff
(Polytechnic University of Puerto Rico, 2017)
The purpose of this project is to determine if it is economically and physically feasible to install a water management system that
will help solve the flooding problem that the educational institution XYZ has been ...
Engine Instrumentation Database Optimization
(Polytechnic University of Puerto Rico, 2017)
This paper examines the turnaround time of a database task in a company at Puerto Rico. The main purpose of the paper is identifying the main problems in order to reduce turnaround time on the delivery of a specific task. ...
Reliability Excellence in Utilities
(Polytechnic University of Puerto Rico, 2017)
The Reliability Excellence tools and methods are explained through this paper providing an effective understanding on how to
apply it in different areas such as: utilities, facilities and manufacturing. Using the Reliability ...
Maintenance Stream Process for Pont Airlines Engine Fleet
(Polytechnic University of Puerto Rico, 2017)
Starting in 2020, the new Alpha engines of the Pont Airlines will enter into maintenance. One of the facilities has been used as variable control for areas of opportunity in the following areas: maintenance procedures, ...
Reduction of Review and Approval Process for Manufacturing Procedures
(Polytechnic University of Puerto Rico, 2015)
Long waiting times for the review and approval process in the Manufacturing Department affects the batch. The main causes of this problem are the missing signature, dates, comments, steps not executed properly, and formula ...