Buscar
Mostrando ítems 31-40 de 146
Optimizing the Cubuy Water Treatment Plant for Achieving the Long Term 2 Enhanced Surface Water Treatment Rule Requirements
(Polytechnic University of Puerto Rico, 2013)
The Long Term 2 Enhanced Surface
Water Treatment Rule is requiring additional
removal or inactivation of Cryptosporidium Oocyst
for public drinking water system. The Cubuy Water
Treatment Plant needs to provide an ...
Reducción en el Tiempo de un Proceso de Esterilización en un Tanque para la Manufactura de un Producto Biológico
(Polytechnic University of Puerto Rico, 2013)
Con el propósito de reducir costos en
producción asociados a tiempos de espera, con este
trabajo evaluaremos el proceso de esterilización de
un tanque fijo. Se revisará si es posible reducir el
tiempo de exposición de ...
Continuous Improvement in the Retention and Employment Placement – Link Between Both Processes
(Polytechnic University of Puerto Rico, 2013)
For the last decade, the socialeconomic factors as violence, underground
economy, the poverty level of living, high
unemployment, generations depending on subsidies
fund from the United States, has negatively
impacted ...
Risk Prevention in Syringe Filling Line in a Pharmaceutical Manufacturing Plant
(Polytechnic University of Puerto Rico, 2013)
Risk prevention in syringe filling line
can be achieved through the implementation of
“Defense in Depth” concepts. Defense in Depth is
based on the integration of 3-layers of operational
controls which are Equipment, ...
Potable Water Quality Improvement in a Water Filtration Plant Facility
(Polytechnic University of Puerto Rico, 2013)
The processes used for treatment in
water plants depend on the quality of the source
and the desired quality of the water. The chemicals
selected for the treatment depend on the
effectiveness to obtain the desired ...
Finished Goods Failure Reduction in a Wound Closure Medical Device Product Family
(Polytechnic University of Puerto Rico, 2013)
A corrective action and preventive
action plan was developed to address the increase
of Finished Goods failures in a wound closure
medical device product family. Following a DefineMeasure-Analyze-Improve-Control Six ...
Manufactura Esbelta en los Servicios de Limpieza de Cuartos en la Industria Hotelera
(Polytechnic University of Puerto Rico, 2013)
La manufactura esbelta (lean
manufacturing) es una forma de gestión de
procesos que permite a las empresas adaptarse
fácilmente a las condiciones cambiantes del mundo
globalizado. Su aplicación es diferente en ...
Disaster Recovery Plan Creation for GiveChance Foundation
(Polytechnic University of Puerto Rico, 2013)
GiveChance Foundation is a non-profit
Foundation created for helping children born with
health problems through the help of sponsorship.
The Foundation helps serve children from a week
born up till the age of 13, having ...
Improvement in the Utilization of the Utilities Operator’s in a Pharmaceutical Industry in Puerto Rico
(Polytechnic University of Puerto Rico, 2013)
Personnel's motivation, performance
and accuracy to execute their duties are important
part impacted by unbalanced workload and
insufficient number of resources. The evaluation of
resources and balance workloads are ...
Quality System Management for Process Analytical Technology Applications
(Polytechnic University of Puerto Rico, 2013)
Commonly the pharmaceutical industry
uses a system known as the traditional or
conventional process for the manufacturing of their
products. Now, it has been shown that the use of
other systems not only benefits in ...