Mitigación de Erosión en Paseo Lineal en Puerta de Tierra
(Polytechnic University of Puerto Rico, 2021)
La situación actual en el Paseo Lineal de Puerta de Tierra requiere una acción inmediata para mitigar la erosión costera. Bajo el renglón de análisis, se evaluaron varias alternativas y en busca de efectividad tanto ...
Separación laboral: causa, efecto y consecuencias
(Polytechnic University of Puerto Rico, 2021)
Este proyecto busca las causas principales que incrementan las separaciones laborales dentro de grandes compañías como L3
Harris Technology. A través de evaluaciones, encuestas y entrevistas, se encontró la necesidad de ...
Electrical and Controls Maintenance Strategy
(Polytechnic University of Puerto Rico, 2021)
Keeping an automated manufacturing line in the pharmaceutical industry competitive through the end of life is challenging.
The total cost of ownership starts increasing with the amount of new problems that arise as ...
Change Control Process of the Planning Control Documents
(Polytechnic University of Puerto Rico, 2021)
The Change Control Process of the Planning Control Documents (PCDs) for a manufacturing organization was manually
coordinated and involved multiple entities with different change mechanisms. Therefore, the process was ...
Reestructuración y desarrollo de instalaciones en desuso utilizando la Metodología de Ruta Critica
(Polytechnic University of Puerto Rico, 2021)
Este proyecto se desarrolló con el objetivo de implementar la metodología de Ruta Crítica para la construcción de salón de
entretenimiento y áreas deportivas en la compañía Pratt and Whitney Puerto Rico localizada en ...
Cogeneration with Energy Sustainability Project for Bacardi Distillery
(Polytechnic University of Puerto Rico, 2021)
At the Bacardi Distillery facilities in Puerto Rico, power outages are a problem that have affected rum production operations and costs. It has been identified that the cause of this problem is that the facilities do not ...
Syringe Filling Line Changeover Time Reduction by CIP Recipe Overlap with Product Transfer Recipe
(Polytechnic University of Puerto Rico, 2021)
In a biopharmaceutical company, the syringe filling process is thru one of two filtration trains that must be previously washed with a cleaning in place and sterilized with sterilization in place. Therefore, while one train ...
Freight Cost Reduction Project
(Polytechnic University of Puerto Rico, 2022)
Shipping products from the Caribbean have a limited amount of freight options in comparison with other geographical regions. For
HPE Puerto Rico, one of the main business goals for FY23 is to establish initiatives that ...
Medtronic Manufacturing Increase Capacity
(Polytechnic University of Puerto Rico, 2021)
Medtronic is a Fortune 500 company that dedicates in designing and manufacturing of medical devices. The company created an insulin pump that serves the function of an artificial pancreas. To develop a duplicate of the ...
Categorical Exclusions: problems in the evaluation and submission process, comparison of requirements and guide to help the professional in the process of environmental compliance
(Polytechnic University of Puerto Rico, 2023)
Categorical exclusions are actions that do not have a significant effect on human health or the environment. In Puerto Rico, projects that are considered to be categorical exclusions are worked on under a Declaration of ...