Buscar
Mostrando ítems 101-110 de 143
The Application of Lean Tools Using the Plan-Do-Check-Act Cycle
(Polytechnic University of Puerto Rico, 2011)
Abstract - This kaizen event is going to illustrated how to apply Lean principles and tool using the PLAN-DO-CHECK-ACT methodology. Throughout the project it will be demonstrated how important the Lean principles are for ...
Lean Six Sigma: Process Improvement at Hospital X’s Emergency Department
(Polytechnic University of Puerto Rico, 2017)
The opportunity to establish and
outcome some frequently used industrial and
process engineering tools in a 28-bed, hospital
emergency department (ED), located in Puerto
Rico, was presented to CIRACET Corp. With ...
Reduction of Time in a Manufacturing Process for a Pharmaceutical Company Located in Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Abstract - The project is developed in a chemical plant of a pharmaceutical company in Puerto Rico. In 2011 the company had an increase in market demand of the active ingredient of one product. To ensure the profit plan, ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Optimización en el Proceso de Manejo de Materiales para las Operaciones Técnicas
(Polytechnic University of Puerto Rico, 2017)
Era utilizada la metodología de Lean
para reducir el costo de inversión en la compra de
materiales de instalación para los procesos de
operaciones técnicas. Este método está basado en
reducir considerablemente el alto ...
Design and Implementation of Lean Concepts in the HVAC Construction Industry
(Polytechnic University of Puerto Rico, 2017)
Construction Projects are always
unique, and risks rise from several different sources.
These situations bring new opportunities to improve
critical areas in a project. As a Project Management
approach, certain phases ...
Improving a Dialysis Center Construction Project: A Lean Perspective
(Polytechnic University of Puerto Rico, 2017)
Due to the necessity of the construction
of new facilities for healthcare, the Lean tools are
applied in a construction project. Specifically, in the
construction of a new facilities for a dialysis center,
to reduce ...
Research in the Requirements for Reducing the Blood Transfer Device Complains for Air Bubbles and Leakage
(Polytechnic University of Puerto Rico, 2017)
An increase on complain trigger a
company Quality department raising a flag for
further investigation of a product Nonconformance.
Using Lean Six Sigma tools and DMAIC
methodology a multidisciplinary team work together
to ...
Optimización en el Manejo del Inventario de Laboratorio en una Planta Química de Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Sinopsis - Esta investigación desarrolló un sistema para mecanizar el inventario del laboratorio de una planta química de Puerto Rico. Utilizó el inventario de 3 laboratorios: “In-Process” - Materia Prima, Microbiología y ...
Hair Salon Process Improvement: A Lean Six Sigma Application to Service Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - In this project the waiting elapsed time of a customer will be analyzed and standardized to reduce or eliminate this time. The main objective of this project is to keep customer waiting time within 0 to 15 ...