Buscar
Mostrando ítems 11-20 de 22
Improvement of the Statistical Techniques Quality System Element in a Medical Device Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project is focused on reducing the compliance risk of a Medical Device Manufacturer by improving its Statistical Techniques Quality System Element. Lean Sigma Methodology was used to identify the inputs or ...
Tracking System for Useful Life of an Insulin Pump Motor
(Polytechnic University of Puerto Rico, 2016)
This research project was focused in
the implementation of a Tracking System for the
useful life of an infusion pump’s motor. This
component is a sub-assembly of the infusion pump
which is used to deliver fluids into ...
Reducción del Tiempo de Proceso para la Manufactura del Catéter de Bonanno
(Polytechnic University of Puerto Rico, 2011)
Abstracto - Este proyecto fue llevado a cabo en una planta de dispositivos médicos. Su propósito fue estudiar el proceso de manufactura del catéter del producto Bonanno para encontrar oportunidades reduciendo un 15% el ...
Anti-inflammatory Drug Elution Rate Variability Reduction
(Polytechnic University of Puerto Rico, 2013)
This project was focused in the Drug
Elution Rate Variability of an Anti-inflammatory
Drug used in a Medical Device Company. The
project is based on the manufacturing and bonding
process of a DXA Drug Collar that is a ...
Reduction of Cosmetic Defects Due to Criteria Misalignment at a Medical Device Manufacturing Line Using DMAIC Methodology
(2013)
For the last few years, the economy of
Puerto Rico has been negatively affected,
increasing the operational cost of the industries in
the Island. The Pharma / Medical Device industry
is not excluded of this situation. ...
Increase of Manufacturing Line Capacity using Lean Manufacturing on a Medical Device Company
(Polytechnic University of Puerto Rico, 2013)
The competition between Medical
Devices companies is increases every day. Many
medical devices companies are marketing products
that compete between each other. They challenged
to obtain long term contracts to supply ...
Finished Goods Failure Reduction in a Wound Closure Medical Device Product Family
(Polytechnic University of Puerto Rico, 2013)
A corrective action and preventive
action plan was developed to address the increase
of Finished Goods failures in a wound closure
medical device product family. Following a DefineMeasure-Analyze-Improve-Control Six ...
Application of Lean Six Sigma Methodology to Optimize Fixation Device Assembly Line in the Medical Devices Industry
(Polytechnic University of Puerto Rico, 2013)
The research project was focused in the
line optimization of a Fixation Device assembly line
in a Medical Devices Industry. The Fixation Device
is called ProTack™. The Covidien Company is the
manufacturer located in ...
Medical Device Assembly Yield Improvement: Application of Quality Foundations
(Polytechnic University of Puerto Rico, 2013)
Quality foundations application is not a
new concept for medical device, manufacturing,
and service industries. The key quality concepts
have origins from the quality pioneers named as
“gurus” Joseph Juran, Deming and ...
Quality Improvement Process for Software Controls in Regulated Industry using Six Sigma Methodology
(Polytechnic University of Puerto Rico, 2013)
A regulated industry at medical
devices company, Software Control practices on
Automated Processes are weak and not
systematized. Several findings were found in past
internal audits related to software revision
changes. ...