Industrial Plant Equipment Maintenance Strategy
(Polytechnic University of Puerto Rico, 2020)
At Robins Air Force Base, specifically in the engineering equipment maintenance department, a problem has been identified in the management of labor. Equipment / machineries used in the production area suffer from high ...
BMC Injection Molding Process Cycle Time Reduction
(Polytechnic University of Puerto Rico, 2021)
High cycle time is one of most common downtime in molding processes, affecting the output and the efficiency of the area. Equipment and tool condition are key to sustain a proper cycle time. This project aimed to reduce a ...
Ultrasonic Welding Process Improvement for the Scrap Reduction of a Medical Device
(Polytechnic University of Puerto Rico, 2020)
A medical device company in Puerto Rico aims to improve an Ultrasonic Welding Process of a high-volume bone shredding medical device. The current process yield is 93% and must be at least 95% to meet the manufacturing site ...
Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5%
(Polytechnic University of Puerto Rico, 2020)
Productivity is the most significant factor in manufacturing industries. Low productivity of workers can have a great impact in the finances of an organization. In this project paper, the focus is to improve the manufacturing ...
Implementación de un sistema costo-beneficio en un programa de vacunación
(Polytechnic University of Puerto Rico, 2021)
Vacunas Bright Center es un centro de vacunación con dos localidades que trabaja un promedio de 200 vacunaciones externas al año. Se identificó un problema financiero de la compañía donde no existe una herramienta que ...
Aumento en entrega a tiempo al cliente en línea de producción
(Polytechnic University of Puerto Rico, 2020)
El aumento en entrega a tiempo es un factor esencial para mantener relaciones comerciales con el principal cliente de la
corporación. Cambios de órdenes prolongados, desorganización en la línea de manufactura y la falta ...
Reduction of Lighting Energy Consumption by 25% Site Wide
(Polytechnic University of Puerto Rico, 2019)
The lighting energy consumption is typically overlooked at Department of Defense facilities because, if it works and provides sufficient lighting, no one complains. The key to achieving energy savings through lighting, is ...
Mejoramiento del proceso de estudios de campo e instalaciones
(Polytechnic University of Puerto Rico, 2019)
El proyecto que se presenta a continuación se compone del mejoramiento del proceso de estudios de campo e instalaciones en una empresa de telecomunicaciones. Aquí se encontrará un desglose de todas las reuniones con diversos ...
Analysis and Optimization of Employee Parking for Company XYZ
(Polytechnic University of Puerto Rico, 2012)
Company XYZ has the need to reduce costs and improve personnel safety. Current parking accommodations are costly and unsecure. To resolve this issues three possible solutions were analyzed: parking re-distribution, ...
Power Plant environmental cleaning schedule optimization
(Polytechnic University of Puerto Rico, 2013)
Since switching to natural gas as their primary fuel, the boilers at a power plant of the Puerto Rico Electric Power Authority are kept cleaner and with minimum environmental pollution. According to a consent decreed with ...