Search
Now showing items 1-10 of 36
Setup Time Reduction in the Water for Injection Sampling Process on the Pharmaceutical Industry
(Polytechnic University of Puerto Rico, 2020)
This work consists in the development of
a new WFI sampling route that will bring several
important benefits to the pharmaceutical industry.
Reduction in the setup time will improve daily
operations in terms of efficiency, ...
Process Optimization by Implementing Lean Six Sigma in an Optical Manufacturing Laboratory
(Polytechnic University of Puerto Rico, 2010)
The Design Project intends to be
implemented in an Optical Manufacturing
Laboratory. This laboratory is located at Mayagüez
with the purpose of distributing ophthalmic lenses
to different optical centers around the ...
Mejorar la Eficiencia en el Laboratorio Químico de una Farmacéutica a través de Aplicaciones de Metodología de Calidad
(Polytechnic University of Puerto Rico, 2019)
Los laboratorios son de suma
importancia, no solo en las escuelas y
universidades; también lo son para las
investigaciones y las farmacéuticas. Estos son los
encargados de asegurar la calidad de sus productos.
Los ...
Lean Six Sigma Application to reduce cycle time in the waiting process for medical attention in patient with green categorization in adult emergency area in Hospital X
(Polytechnic University of Puerto Rico, 2010)
The service area is one of the healthcare
industries area that are in continuous search to
optimize their process in order to provide a quality
service to their customer (patient). In order to
provide a total to quality ...
Lean Manufacturing Applied to In-Process Protein Concentration Determination Changing the Standard UV-Spectrometer for the Solo Variable Pathlength Extinction
(Polytechnic University of Puerto Rico, 2020)
The protein concentration test is a
complicated test, which requires a lot of time and
materials. Currently the test is being performed
using an old equipment of UV-Spectrometer
Visible. In this project, the researcher ...
Controlled Environmental Area Room B Relayout for Acuity X4 Subassemblies Manufacturing Line Transfer
(Polytechnic University of Puerto Rico, 2021)
Boston Scientific is part of a competitive environment and strives to find methods to reduce cost, waste and improve quality. A methodology for reduction is Lean manufacturing. This methodology is used to reduce “muda” ...
Cost Improvement Tracking System to Promote a Stream Lined Program
(Polytechnic University of Puerto Rico, 2022)
This project presents the development of a process supported by a technology mechanism to facilitate the tracking and management of programs implemented by organizations to lower the cost base and/or promote ...
Process Time Reduction in Manufacturing Areas: Visual Valves Identification on Manufacturing Area specifically on Media Prep Area, Media Preparation tanks to Pursue Agility on the Visual inspections required before, during and after the Media Prep Solution are Prepared
(Polytechnic University of Puerto Rico, 2022)
Time of production process and associate activities were evaluated for Media Prep manufacturing process on Juncos, P.R. The voice of the customer requested reduced time inspection process before, ...
New flow route for the delivery of the to be cleaned filling equipment for the lot-to-lot changeover optimization using the lean manufacturing methodology
(Polytechnic University of Puerto Rico, 2022)
Management demand to reduce downtime in manufacturing had increased in recent years. This led manufacturing to use the Lean Methodology and Six Sigma tools to optimize the process. Focused on process improvement and ...
Using Six Sigma Methodology and Technology to Improve Quality Audit Process Cycle Time
(Polytechnic University of Puerto Rico, 2022)
Currently, at the “Pharmaceutical Company Y”, the cycle for launching a product can take an average of 46.7 days. The proposal for this study seeks to reduce this cycle time to 30 days. This project illustrates the ...