Mostrar el registro sencillo del ítem

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorNieves Castro, Rafael
dc.contributor.authorCruz Martínez, Karina Y.
dc.date.accessioned2022-12-20T13:28:54Z
dc.date.available2022-12-20T13:28:54Z
dc.date.issued2022
dc.identifier.citationCruz Martínez, K. Y. & Nieves Castro, R. (2022). New flow route for the delivery of the to be cleaned filling equipment for the lot-to-lot changeover optimization using the lean manufacturing methodology [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/1779
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractManagement demand to reduce downtime in manufacturing had increased in recent years. This led manufacturing to use the Lean Methodology and Six Sigma tools to optimize the process. Focused on process improvement and down time reduction an initiative started to reduce the lot-to-lot changeover for filling areas. A new flow route was added to the Standard Operating Procedure to deliver the used filling equipment. This new flow route resulted in a reduction of 33% in movement waste and a 58% benefit of time spent on task for the Syringe Filling Line, and a 43% in movement waste and 67% time spent on task benefit for the Vial Filling Line. The ergonomic risk was calculated for the task, and it was lowered from a Moderate to a Low Risk after implementing administrative ergonomic controls in the Job Hazard Analysis. These results yielded a positive impact in time reduction for both filling lines. Key Terms ⎯ Flow Route, Lean Manufacturing, Lot-to-Lot Changeover, Process Improvement.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManufacturing Competitiveness;
dc.relation.ispartofseriesFall-2022;
dc.relation.haspartSan Juanen_US
dc.subject.lcshLean manufacturingen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshSix sigma (Quality control standard)
dc.titleNew flow route for the delivery of the to be cleaned filling equipment for the lot-to-lot changeover optimization using the lean manufacturing methodologyen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem