Zero Waiting Time at the Emergency Room
(Polytechnic University of Puerto Rico, 2013)Long waiting times at the Emergency Rooms are a problem that affects every hospital in Puerto Rico. The main causes of this problem are the lack of patients understanding the purpose of the ER and the inefficient use of ... -
Automation of Guidewire Packaging Lines at ABBOTT Laboratories Vascular Division
(Polytechnic University of Puerto Rico, 2013)With the increasing demand for guidewires worldwide, Abbott decided to make changes in the manufacturing line in order to meet these demands. In an evaluation of the manufacturing process, they considered that the area ... -
Improve Major Changeover Procedure in MK0431AR Coating Area
(Polytechnic University of Puerto Rico, 2013)Today, most plants are running multiple products per line per day, including varieties of the same products, requiring many changeovers with the intense pressures to boost production efficiency, meet increasing consumer ... -
Toxoplasma IgG Quality Control Testing Optimization
(Polytechnic University of Puerto Rico, 2013)This project explores a lean initiative of a multinational healthcare company related to a Toxoplasma IgG (protozoan parasite) quality control test. The objective was to reduce the test’s cycletime, material consumption ... -
Mecanización de Inventarios en una Agencia de Gobierno
(Polytechnic University of Puerto Rico, 2013)El control de pérdidas y su impacto en el manejo presupuestario, describe la problemática en una de las Agencias del Gobierno de Puerto Rico. Este análisis sostiene que el 50% de la inversión no es contabilizada en los ... -
Comparación entre el Proceso de Permisos bajo la Ley Orgánica de la ARPE y la Reforma de Permisos de Puerto Rico
(Polytechnic University of Puerto Rico, 2013)La reforma del proceso de permiso implementada en 2010, consistió de un proyecto de reingeniería que logró la transformación y modernización del proceso creado bajo la Ley Orgánica de ARPE en el 1975. Ambos procesos son ... -
“Technology Roadmap”: Reemplazo de Dispensadores de Epoxy
(Polytechnic University of Puerto Rico, 2013)Con el fin de mantener la competitividad en el mercado actual, Medtronic Puerto Rico busca optimizar sus operaciones de manufactura a través de la innovación y la tecnología. El “Technology Roadmap” consiste de un plan ... -
Reducción de la Tasa del Defecto de Cortocircuito Detectado
(Polytechnic University of Puerto Rico, 2013)El propósito de este proyecto es identificar posibles causas y factores que influyan al defecto de cortocircuito detectado en catéteres del modelo XYZ. Este proyecto envuelve la metodología para solucionar problemas Definir, ... -
Integrated Solid Waste Management Solutions for Puerto Rico: Small, Replicable Steps Towards Achieving Drastic Changes
(Polytechnic University of Puerto Rico, 2013)This project recommends strategies for developing an Integrated Solid Waste Management Plan for Local Government Units (LGUs), which, in the case of Puerto Rico, applies to Municipal Governments, for their implementation ... -
KAIZEN en la Autoridad de Acueductos Alcantarillados
(Polytechnic University of Puerto Rico, 2013)La Autoridad de Acueductos Alcantarillados ha lanzado una iniciativa de alto impacto la implementación de la filosofía de KAIZEN como una estrategia de mejorar la productividad y sus servicios operacionales. KAIZEN es ... -
Office Area Air Conditioning Optimization using Variable Refrigerant Volume System
(Polytechnic University of Puerto Rico, 2013)An office area located in a food industry manufacturing plant of Puerto Rico was analyzed, and a variable refrigerant volume system (VRV) was proposed. Calculations showed an expected energy consumption reduction of around ... -
Replacement of manufacturing plastic containers with 600l stainless steel bins
(Polytechnic University of Puerto Rico, 2013)In order to improve Compression, Coating and Packaging areas at the pharmaceutical company Sandoz in Wilson, NC, it was evaluated the possibility of replacing the current plastic containers used to hold and transport ... -
Transición de Almacén de una Farmacéutica a una Compañía Independiente
(Polytechnic University of Puerto Rico, 2013)Los altos costos asociados a espacio de almacenamiento en Puerto Rico para las industrias farmacéuticas tienen un gran impacto en sus costos operacionales y, por tanto, puede afectar el éxito de sus operaciones. El principal ... -
Optimización de un Centro de Distribución a través de la implementación de un Sistema Automático
(Polytechnic University of Puerto Rico, 2013)Después de realizar un análisis de optimización de un centro de distribución, se concluyo que el departamento de sortear la mercancía era el departamento donde se requería mayor intensidad de fuerza labora la cual impactaba ... -
Cambio en una Empresa con una Estructura Organizacional Quebrantada Mediante la Planificación Estratégica y Operacional
(Polytechnic University of Puerto Rico, 2013)Una empresa familiar que afrontaba problemas financieros necesitaba ayuda para poder contrarrestar la debacle a la que habían llegado por la mala toma de decisiones. Se trabajó con su estructura organizacional, la cual ... -
Cycle time reduction based on structured Fist-in-First-out queue management control
(Polytechnic University of Puerto Rico, 2013)Queue management systems are set up to manage ticket ranking for a service. In this case, tickets received are for engineering software and electronic library issues within the company and all its subsidiaries. The steps ... -
Optimizar el Proceso de Recolección de Llantas Usadas en P.R.
(Polytechnic University of Puerto Rico, 2014)La generación de 4.7 millones de neumáticos usados al año afectaron la Isla de Puerto Rico. La regulación de manejo de llantas fue el punto de partida en el análisis. Como se manejaron las importaciones de neumáticos y ... -
Proceso Efectivo de Liderar un Plan Estratégico Previamente Establecido
(Polytechnic University of Puerto Rico, 2014)¿Qué sucede cuando se nombra un ejecutivo a dirigir un Plan Estratégico Previamente Establecido? ¿Qué metodología se puede crear para lograr que se complete en un 90% o más el plan? Esto es un reto de investigación y para ... -
Managing a Situation of Over-Hire in a Government Research Development and Engineering Agency without Firing Employees
(Polytechnic University of Puerto Rico, 2014)This project shows a situation many managers face, a reduction drill. May it be in private industry or a government agency; it is not easy for any manager to have to be part of a Reduction in Force (RIF). On the government ... -
Implementación de Mantenimiento Predictivo en Johnson & Johnson Utilizando el Método de Análisis de Vibraciones
(Polytechnic University of Puerto Rico, 2014)Johnson & Johnson pierde millones de dólares cada año en reparaciones de equipos sofisticados de producción de tabletas. Los costos operacionales, por causa de equipos que fallan inesperadamente, han sido un impacto económico ...