Auflistung Management nach Titel
Anzeige der Dokumente 62-81 von 380
-
Damaged cable solution on F-35 electric motor on Aerospace Industry
(Polytechnic University of Puerto Rico, 2022)Broken wires on the electromagnetic motor of the F-35 aircraft is a problem that negatively impacts the production line. Each broken wire defect is equivalent to a loss of $6,000. The major causes of these broken cables ... -
Damaged Magnet Wire Solution for Boeing 787-10 Electric Motor Pump
(Polytechnic University of Puerto Rico, 2023)Damaged magnet wires is a problem that negatively affects the production of the 787-10 Boeing Airplane Electric Motor Pump. The major cause of damaged magnet wire during removal process is lack of adequate core protection. ... -
Data Center Monitoring System Upgrade
(Polytechnic University of Puerto Rico, 2020)The project was developed at the Headquarters of the Defense Commissary Agency (DeCA), located at Fort Lee, Virginia, that operates nearly 240 commissaries worldwide. The Agency’s data center was experiencing a high ... -
Desalinización del agua de mar, ¿Opción viable para Puerto Rico?
(Polytechnic University of Puerto Rico, 2021)Este tema de investigación propuesto buscar plantear los retos más grandes que presenta Puerto Rico a la hora desalinizar el agua de mar y convertirla en agua potable durante un evento futuro de sequía. Determinar si ... -
Desarenador de flujo horizontal para la planta de tratamiento primaria de aguas residuales PAS Puerto Nuevo, Autoridad de Acueducto y Alcantarillados
(Polytechnic University of Puerto Rico, 2020)Este proyecto se está realizado en la planta de tratamiento de aguas usadas, PAS Puerto Nuevo en San Juan. El problema que se intenta resolver es la acumulación de arena en los clarificadores y el efecto de abrasión en el ... -
Desarrollo de Nueva Línea de Ensamblaje de Producto X
(Polytechnic University of Puerto Rico, 2023)El objetivo de este proyecto fue desarrollar una nueva línea de ensamblaje y establecer procedimientos operativos estándar para el Producto X en una empresa especializada en dispositivos médicos estériles. Se analizó el ... -
Desarrollo de un Sistema de Control de Inventario y Mantenimiento de Equipos
(Polytechnic University of Puerto Rico, 2021)Como parte de la gestión de incorporar equipo dentro de unas nuevas instalaciones, se desarrolló un sistema de control de inventario y mantenimiento dentro de un almacén de una agencia militar. Las cinco fases de la ... -
Desmineralización de agua potable para una industria de soluciones farmacéutica
(Polytechnic University of Puerto Rico, 2017)El agua para los procedimientos de fabricación es un problema por el cual pasan empresas en el mundo. Las aguas para uso industrial requieren cualidades que no están disponibles en origen, por lo que deben someterse a ... -
Development of an Integrated Water Management Model to Reduce Water Wastage
(Polytechnic University of Puerto Rico, 2020)The increasing water demand, due to the pharmaceutical companies, agricultural and other socio-economic sectors, threatens groundwater resources. This situation represents a limiting factor and it may result in conflicts ... -
Development of Fiscal Year 2018 Annual Work Plan for Facilities Sustainment, Restoration and Modernization Projects
(Polytechnic University of Puerto Rico, 2017)Planning is an integral part of every aspect in life. This article discusses the development of an annual work plan in a Directorate of Public Works. The goal is to explain the importance of having a plan established and ... -
Development of Site Quality Assurance & Compliance Near Miss Program
(Polytechnic University of Puerto Rico, 2023)The focus of this project is to create a Quality Assurance & Compliance (QAC) Near Miss program in a medical device company with the objective to reduce the number of 2023 near misses by 25%. A ranking system and tracking ... -
Development Studies for the Surgicel SNoW Load Increase in the Dehumidification Chamber
(Polytechnic University of Puerto Rico, 2022)A medical device company was facing a significant downtime related to “waiting for material”. Due to the high processing time and small loads in the dehumidification process, the next operation (Sealing) was being impacted. ... -
Development, Assignment and Control of Technical Work
(Polytechnic University of Puerto Rico, 2017)The Development, Assignment and Control of Technical Work is a management system used in any organization as a standard operating procedure. The procedure will support the engineering manager, while mitigating the organization ... -
Diagnóstico del Estado Actual del Proceso de Elaboración y Empaque del Producto Enlatado y Análisis de su Problemática de Sobrepeso Usando Seis Sigma
(Polytechnic University of Puerto Rico, 2020)Se estudia el proceso de fabricación y empaque del producto enlatado de Industrias La Coruña debido a que se obtiene un producto con un peso mayor al declarado en la etiqueta causado por la variabilidad en los subprocesos, ... -
Digitalization and Standardization of Project Minutes
(Polytechnic University of Puerto Rico, 2023)Fragmented processes for capturing infrastructure project meeting minutes have inhibited transparency, productivity, and information access across Puerto Rico's municipalities. A newly implemented initiative systematically ... -
Diseño de Manual para Habilitación de Cervecería Artesanal
(Universidad Politécnica de Puerto Rico, 2020)En un mundo en constante evolución, donde el consumismo lleva a procesos industrializados de producción masiva de todos los bienes y servicios, la producción artesanal se ha convertido en un lujo que promueve el crecimiento ... -
Diseño de un modelo de emisiones en tiempo real de proceso de una planta de Biotecnología
(Polytechnic University of Puerto Rico, 2012)El escenario de emisiones de una planta de biotecnología desarrollado durante su diseño varía significativamente de su operación normal. Por lo regular, y para disminuir cualquier posibilidad de incumplimiento legal, se ... -
Disminución de Tiempo en Llamadas en Centro de Servicio Bancario
(Polytechnic University of Puerto Rico, 2022)El centro de servicios FLSC de FirstBank Puerto Rico confrontó a mayor magnitud un alto volumen de llamadas y alto tiempo en ellas tras fusionarse con Banco Santander. El extenso tiempo en llamadas y la baja productividad ... -
Distribución Efectiva de Tareas y Responsabilidades de los Inspectores para Optimizar el Plan de Mantenimiento Preventivo
(Polytechnic University of Puerto Rico, 2022)Este escrito presenta las soluciones recomendadas a la problemática del Directorado de Obras Públicas en una instalación militar. La División de Operaciones y Mantenimiento, la cual es responsable de supervisar el mantenimiento ... -
Dominguito Transformer Overload
(Polytechnic University of Puerto Rico, 2023)Assessments were made in Arecibo, Puerto Rico, between 2021 and 2023 to determine the root cause for loading issues that were occurring in this area. From this investigation, it was found that Dominguito substation has an ...