    • Packaging Cold Chain Program Improvement 

      Cardona Colón, Laura (Polytechnic University of Puerto Rico, 2018)
      With the growing trend of biologic medicines coming to the market, a packaging engineering group needed to create an internal cold chain process to meet market demand in this area of cold shipments; although there is a ...
    • Past Due Reduction on 37mm Syringe Filters Manufacturing Line 

      Miralles, Alejandro (Polytechnic University of Puerto Rico, 2021)
      In Pall Life Sciences Puerto Rico, the past due on the 37mm manufacturing line was at $262,000 and continues increasing. The root cause for this issue is due to a mix of material shortage and customer demand increase. After ...
    • Phosphate Waste Reduction Initiative 

      Rivera, Edgardo L. (Polytechnic University of Puerto Rico, 2013)
      Budget Waste Expense increased by more than 20% due to incremental phosphate waste (PHOW) during new product lot campaign at Amgen Manufacturing Limited. This constant PHOW increase was pointing toward a possible root cause ...
    • Plan de mejora para la identificación, adquisición, almacenamiento y control de las piezas de repuesto utilizadas en los equipos de producción y planta física 

      Cruz Rodríguez, Ivelisse (Polytechnic University of Puerto Rico, 2013)
      La necesidad de implementar un sistema robusto de piezas de repuesto es fundamental para la compañía, ya que el tiempo de parada por falta de piezas de repuesto es muy costoso. Por tal razón se trabajó con urgencia un ...
    • Plan de mejoras de procesos en la creación de ambientes de desarrollo y producción 

      Santana Jorge, José (Polytechnic University of Puerto Rico, 2020)
      En el 2018, la empresa Seguros de Puerto Rico (SPR) obtuvo una clasificación 4.5 estrella de una agencia federal reguladora del servicio de los planes de salud en los Estados Unidos. Para 2019, SPR tuvo una drástica ...
    • Plan Estratégico de Ventas de Piezas y Equipos para una Compañía 

      Miranda Santiago, Angel R. (Polytechnic University of Puerto Rico, 2015)
      El propósito de este artículo es demostrar la importancia de las ventas en un lugar de trabajo. Como parte de esto se presenta un ejemplo de una compañía la cual su meta principal es lograr ventas día tras día. Además ...
    • Plan para reducir errores de estimados en la factura de la AEE 

      Pacheco Velázquez, José L. (Polytechnic University of Puerto Rico, 2012)
      En este proyecto se desarrolla un plan estratégico priorizado, para reducir las ineficiencias en los procesos administrativos, tales como la medición y facturación. El sistema de lectura de los contadores de la Autoridad ...
    • Positive impacts of having good maintenance management in the manufacturing industry 

      Cancel Cruz, Ramón (Polytechnic University of Puerto Rico, 2013)
      Many companies especially family-owned businesses do not offer the proper maintenance for their machinery. Such sloppiness in any company is responsible for more expenditure on operations as well as a decrease in production ...
    • Power Plant environmental cleaning schedule optimization 

      Ramos Vega, Luis D. (Polytechnic University of Puerto Rico, 2013)
      Since switching to natural gas as their primary fuel, the boilers at a power plant of the Puerto Rico Electric Power Authority are kept cleaner and with minimum environmental pollution. According to a consent decreed with ...
    • Preventive Maintenance Work Order Optimization 

      Sánchez, Rosemarie Alcocer (Polytechnic University of Puerto Rico, 2018)
      In the bio-pharmaceutical industry, maintenance is required to ensure equipment functions properly. Maintenance can be defined as activities performed on an equipment to ensure it functions with-in specification and ...
    • Proceso Efectivo de Liderar un Plan Estratégico Previamente Establecido 

      Bonilla Rodríguez, Ruth M. (Polytechnic University of Puerto Rico, 2014)
      ¿Qué sucede cuando se nombra un ejecutivo a dirigir un Plan Estratégico Previamente Establecido? ¿Qué metodología se puede crear para lograr que se complete en un 90% o más el plan? Esto es un reto de investigación y para ...
    • Process Improvement of Equipment Support Project Requests 

      García Miranda, Nicole (Polytechnic University of Puerto Rico, 2020)
      A project request package moves through five different departments: Pre-Induction, Engineering Design, Planning, Material and Execution. The project request package is constantly returned to a previous department for ...
    • Product Data Management Implementation 

      Santana Agosto, Yoanaliz (Polytechnic University of Puerto Rico, 2014)
      The research described in this paper is to enforce the benefits in the manufacturing industry. This particular case the implementation took place in a manufacturing company of sheet metal by implementing Product Data ...
    • Production Performance Increase through Five S Technique on Manufacturing Equipment Tools 

      Colón Ramírez, Christian (Polytechnic University of Puerto Rico, 2022)
      Pharma LLC, a company dedicated to solid drug product manufacturing, performed an assessment and determined they were experiencing overtime cost increases, lower productivity and personnel discomfort with tools and resources ...
    • Productivity Increase on Manufacturing Line A 

      Grant Tejada, Maria Victoria (Polytechnic University of Puerto Rico, 2022)
      In company that shall remain anonymous, Manufacturing Line A was underperforming, often falling back in orders. Therefore, the company decided to put in place a project to look at increasing productivity in this high-mix ...
    • Prognostics and Health Management Optimization for Commercial Engines 

      Ramirez, Ismael A. (Polytechnic University of Puerto Rico, 2016)
      The purpose of this project was to determine an existing problem within the work environment of each individual user. During the duration of the project a process improvement initiatives were implemented by using their ...
    • Propuesta de mejora de abastecimiento, gestión de inventario y procesos operativos del almacén de materiales de empaque en César Iglesias, S.A. 

      De la Cruz, Vianny (Universidad Politécnica de Puerto Rico, 2020)
      La falta de espacio y grandes cantidades de materiales en el Almacén de Empaques en César Iglesias S.A. son un problema importante para la Dirección de Cadena de Suministro. Algunas de las causas principales es la falta ...
    • Propuesta de Mejora de Calidad de identificación del producto terminado de la empresa ETN Corporation 

      Reyes De La Cruz, Scarlett M. (Universidad Politécnica de Puerto Rico, 2020)
      Las quejas de clientes, las unidades retornadas y los costos en que se incurren por la mala calidad en ETN Corporation han sido un problema latente. Debido al incremento que se han observado durante los últimos dos años. ...
    • Propuesta de Servicios de Seguridad y Vigilancia para el Gobierno de Puerto Rico 

      Morales Sánchez, Jorge A. (Polytechnic University of Puerto Rico, 2016)
      El pueblo puertorriqueño se encuentra en una situación política, económica y de incidencia criminal sumamente difícil y retadora. Para solucionar parte de esta situación económica y criminal, se presentó una propuesta de ...
    • Providers Contracting Process Improvements 

      Peguero, Jussyana (Polytechnic University of Puerto Rico, 2018)
      The project of Contracting process improvements was carried out in one of the most recognized companies in Puerto Rico of the Health insurance industry. Currently the Provider’s Contracting process does not meet the time ...