Mostrar el registro sencillo del ítem
Reduction of inventory discrepancies due incorrect bill of material in an electrical manufacturer
dc.rights.license | All rights reserved | en_US |
dc.contributor.advisor | Cruzado Vélez, Héctor J. | |
dc.contributor.author | De León, Kiara | |
dc.date.accessioned | 2024-02-13T16:40:21Z | |
dc.date.available | 2024-02-13T16:40:21Z | |
dc.date.issued | 2020 | |
dc.identifier.citation | De León, K. (2020). Reduction of inventory discrepancies due incorrect bill of material in an electrical manufacturer [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/2136 | |
dc.description | Artículo y cartel de investigación del programa de posgrado Maestría en Ingeniería Gerencial, en acuerdo con la Universidad Politécnica de Puerto Rico (UPPR) e Instituto Tecnológico de Santo Domingo (INTEC). | en_US |
dc.description.abstract | In the company EM, during the last inventory (2020), a lost cost of over US$100,000 was calculated due to incorrect bill of material or discrepancies related to deviations not implemented. This paper focuses on finding the optimal follow-up system to prevent inventory discrepancies due to bill of material errors and on managing future issues related to this subject. The technique followed was the Waterfall Methodology, for which the management expressed the need of a project where the items flagged during the inventory were reduced. During the implementation of the project, the data was divided by deliverables, focusing on vendor lead times and usage of the parts. Four deliverables were completed and, as a result, 500 items were reviewed and 25 projects started, which should be concluded during 2021. Key Terms ⎯ Bill of material, inventory discrepancies, inventory inaccuracy, supply chain | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universidad Politécnica de Puerto Rico | en_US |
dc.relation.ispartof | Management; | |
dc.relation.ispartofseries | Winter-2020; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Posters | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Alliances--Instituto Tecnológico de Santo Domingo (INTEC) | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degree | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Alliances--International Academic Alliances | en_US |
dc.subject.lcsh | Inventory control | en_US |
dc.subject.lcsh | Electric industries | |
dc.title | Reduction of inventory discrepancies due incorrect bill of material in an electrical manufacturer | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Management
Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)