Mostrar el registro sencillo del ítem
Configuration of Manufacturing Line using Cell Operating System on a Patch and Serter Installation System
dc.rights.license | All rights reserved | en_US |
dc.contributor.advisor | Cruzado Vélez, Héctor J. | |
dc.contributor.author | Cruz Ramos, Bryan | |
dc.date.accessioned | 2024-03-11T18:49:52Z | |
dc.date.available | 2024-03-11T18:49:52Z | |
dc.date.issued | 2021 | |
dc.identifier.citation | Cruz Ramos, B. (2021). Configuration of Manufacturing Line using Cell Operating System on a Patch and Serter Installation System [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12475/2247 | |
dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
dc.description.abstract | The objective of this project was to implement a new product to the manufacturing assembly line at medical devices company. The product is categorized at a high inventory level. The manufacturing line was moving from a manual assembly process in some processes to a semi automatic assembly process. The medical devices company was able to use the Cell Operating System (COS), increasing the capacity of the installation system. This Lean Manufacturing method was applied to increase the capacity of the installation system and aiming to move products through the assembly line one piece at a time. All equipment’s of the assembly line was modified to stop and signal when a process is complete or if a problem occurs.The lean manufacturing method was also applied to reduce defects that result from processing and product changeovers. Key Terms ⎯ Capacity, COS, Lean Manufacturing, Process Flow. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Polytechnic University of Puerto Rico | en_US |
dc.relation.ispartof | Management; | |
dc.relation.ispartofseries | Winter-2021; | |
dc.relation.haspart | San Juan | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Subject headings--Unassigned | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Posters | en_US |
dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degree | en_US |
dc.title | Configuration of Manufacturing Line using Cell Operating System on a Patch and Serter Installation System | en_US |
dc.type | Article | en_US |
dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Management
Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)