Zur Kurzanzeige

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorGonzález Madera, Ismael
dc.date.accessioned2024-04-11T12:18:16Z
dc.date.available2024-04-11T12:18:16Z
dc.date.issued2013
dc.identifier.citationGonzález Madera, I. (2013). 5S Method Implementation in Power Department’s Warehouse of the Tren Urbano of Puerto Rico [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2396
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractThe Tren Urbano of Puerto Rico has a lot of material, equipment and tools to make the maintenance works. Many of them are electrical and there is a Power Department to make them. This department has been having problems to maintain the warehouse organized due the high volume of materials, their continuous use, and little space. To have an effective organization in the warehouse, the 5S method was implemented with five phases: sort, set in order, shine, standardize, and sustain. In the first phase, the unnecessary materials, equipment, and tools were removed from the warehouse. During the second phase, the items that remained in the warehouse were arranged by use frequency and in a logical manner; and then were cleaned in the third phase. In the fourth, the first three phases were upheld with a checklist. In the last phase, training was continuously provided to maintain the habit. The organized warehouse improved time to find the materials, equipment, and tools; as well as avoid losing them. Also, no accidents and better results were obtained in electrical testing. Key Terms ⎯ Equipments, Management, Materials, Set in Order, Shine, Sort, Standardize, Sustain, Tools, Visual Management.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesFall-2013;
dc.relation.haspartSan Juanen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.title5S Method Implementation in Power Department’s Warehouse of the Tren Urbano of Puerto Ricoen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Dateien zu dieser Ressource

Thumbnail
Thumbnail

Das Dokument erscheint in:

  • Management
    Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)

Zur Kurzanzeige