Mostrar el registro sencillo del ítem

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorMorales, Irene
dc.date.accessioned2024-04-24T19:37:09Z
dc.date.available2024-04-24T19:37:09Z
dc.date.issued2018
dc.identifier.citationMorales, I. (2018). Sterilization Area Downtime Reduction [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2461
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractWith plans of increasing production, the sterilization area of a pharmaceutical plant has to maximize its operating performance and reduce its downtime. The major offenders of downtime are the micro test cycles, maintenance and the operators’ efficiency. Nevertheless, the data revealed that many of the downtime reported recently is due to lack of production. It was also identified that most of the downtime caused by micro can be eliminated by doing the tests on Mondays and in the mornings, taking advantage of the new production schedule of two 10-hours shifts. In terms of maintenance, as with the micro tests, the mornings have to be used, and new technicians must be hired to perform more maintenance during the weekends. From the operating performance of the personnel, it was identified that the fastest way of unloading and loading the vessels is by working in pairs. All these will reduce the sterilization downtime, but will only count if production stabilizes and increase. Key Terms ⎯ Coordination, Maintenance, Operating Performance, Vessels.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesSpring-2018;
dc.relation.haspartSan Juanen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titleSterilization Area Downtime Reductionen_US
dc.typePosteren_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Management
    Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)

Mostrar el registro sencillo del ítem