• español
    • English
    • Deutsch
  • Deutsch 
    • español
    • English
    • Deutsch
  • Einloggen
Dokumentanzeige 
  •   PRCR Startseite
  • Polytechnic University of Puerto Rico
  • Design Project Articles Master Degree
  • Manufacturing Engineering
  • Dokumentanzeige
  •   PRCR Startseite
  • Polytechnic University of Puerto Rico
  • Design Project Articles Master Degree
  • Manufacturing Engineering
  • Dokumentanzeige
JavaScript is disabled for your browser. Some features of this site may not work without it.

Improve Material Flow at Supplier

Thumbnail
Öffnen
SP-12_Articulo Final_ Mara Cardona.pdf (129.3Kb)
Datum
2012
Autor
Cardona Vega, Mara M.
Metadata
Zur Langanzeige
Zusammenfassung
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have several positive effects in other areas such as supplier quality performance, product field performance and eventually marketing indicators. Cause and Effect diagrams have shown that the high lead time of this supplier is the main contributor (root cause) for material availability issues in the field (which causes loses in sale). In order to have a methodical system to ensure project is successful, Lean Six Sigma will be used. Literature Review section explains how Lean Six Sigma methodology will be used to develop the project. Key Terms ⎯ Analyze, Improve, Measure, Supplier Performance.
URI
http://hdl.handle.net/20.500.12475/471
Collections
  • Manufacturing Engineering

PRC Repository copyright © 2022  COBIMET, Inc.
Kontakt
Theme by 
Atmire NV
 

 

Stöbern

Gesamter BestandBereiche & SammlungenErscheinungsdatumAutorenTitelnSchlagwortenDiese SammlungErscheinungsdatumAutorenTitelnSchlagworten

Mein Benutzerkonto

EinloggenRegistrieren

Statistik

Benutzungsstatistik

PRC Repository copyright © 2022  COBIMET, Inc.
Kontakt
Theme by 
Atmire NV