Buscar
Mostrando ítems 1-10 de 21
Implementation of Lean Methodologies in the Small Radiology Firm Bayamón Radiology Center
(Polytechnic University of Puerto Rico, 2019)
The Lean methodology was used to
reduce examination cycle and lead times for the
radiology clinic Bayamon Radiology Center. They
clinic had a conventional X-ray system that uses
x-ray films. Voice of the Customer and ...
In-Process pharmaceutical manufacturing aqueous coating suspension hold time study
(Polytechnic University of Puerto Rico, 2018)
A hold time study is established in the
development phase of any product. All the InProcess unit operations require a hold time study to
protect the integrity and quality of the final drug
product. This study will analyze ...
Suppliers Information Exchange Process Optimization
(Polytechnic University of Puerto Rico, 2018)
The emphasis of this research project
is to reduce the processing time for supplier’s
requests for change and/or information (RC/I), a
tool utilized to request information and/or change
in response to technical or ...
Changeover Reduction Time by Adjusting the Cleaning Critical Parameters in Automated CIP Systems
(Polytechnic University of Puerto Rico, 2018)
Clean-In-Place (CIP) is a widely use
process to clean biotechnology vessels contact
surfaces. CIP is an automated cleaning method that
involve minimum to no equipment disassembling
thereby reducing labor and time ...
Application of Lean Manufacturing and Lean Six Sigma Tools to Improve Back to Back Activities in the Compression Process
(Polytechnic University of Puerto Rico, 2019)
A recent opportunity regarding a
product ramp up in the production schedule due to
a potential product transfer requires the
manufacturing area to look for creative ways to
improve in order to comply with expected ...
Time Cycle Reduction of the Scrap Process in a Medical Device Company
(Polytechnic University of Puerto Rico, 2011)
As part of an assessment performed for continuous improvement it was identified that the Nonconformance (NC) Timeline metric shows 23% over the goal of 30 days closure. From the list of NC Reports (NCR) impacting this ...
Prescription Timeliness Prediction Using Machine Learning
(Polytechnic University of Puerto Rico, 2018)
Adherence is a very important aspect
for each patient enrolled in a Prescription Drug
Plan, a large gap between claim fills is an indicator
that they might be disrupting their therapy. This
could be due to unavailability, ...
On Boarding Cycle Time Improvement to Accelerate Recruitment of Store Operations
(Polytechnic University of Puerto Rico, 2015)
Recruitment is a crucial step in all of the
companies around the world. Is the process of
finding and hiring the best qualified candidate for a
job opening, in a timely and cost effective manner,
This process also ...
Aero Repairs Documentation Cycle Time Reduction By Lean Application
(Polytechnic University of Puerto Rico, 2014)
In our daily life and world, with a
diversity of industries and services, from health to
manufacturing, all kind of products; many of them
care apply Lean concepts or tools to perform
important improvements to their ...
Optimization of the Registration Process of Products on the Pharmaceutical Industry of Puerto Rico
(Polytechnic University of Puerto Rico, 2018)
Registration Process for
pharmaceutical products in Puerto Rico has unique
requirements for the marketing, sale, and
distribution of the products. The Organizations
must be approved before they can market, sell ...