Buscar
Mostrando ítems 21-30 de 39
Fill and finish Production Line End Effectors Improvements for Reducing Rejected Units due to Robot Pickup Failures
(Polytechnic University of Puerto Rico, 2014)
Since the production of parenteral is
more regulated and complicated, it makes the
manufacture investment cost higher in comparison
with other dosage forms. As result, is important to
apply lean tools in order to reduce ...
Implementation of a New Membrane and the Re-use in a Tangential Flow Filtration System
(Polytechnic University of Puerto Rico, 2014)
Tangential Flow Filtration (TFF) is
commonly used as the last steps in protein
purification processes at Biopharmaceutical Plants
for clarification and concentration of the target
protein. Since the membranes are ...
Reducción de defectos visuales en lentes de contacto: Utilizando la Metodología DMAIC
(Polytechnic University of Puerto Rico, 2014)
La crisis económica ha tenido un
gran impacto sobre la actividad industrial. La
industria de dispositivos médicos dedicados a la
manufactura de lentes de contacto no ha sido la
excepción. En busca de lidiar con esta ...
Packaging Process Improvement in a Manufacturing Environment
(Polytechnic University of Puerto Rico, 2014)
A manual filling, packaging and
labeling process implicates significant labor
intensive tasks that will result in non- standard
process with high variability. This non-standard
process has resulted in more than 20 ...
Lean Manufacturing Techniques to Improve Project Management
(Polytechnic University of Puerto Rico, 2014)
In today’s organizations, project
management has become a central way for
undertaking several of the company’s activities.
One of the increasing and most significant concerns
with projects is that, projects are behind ...
Optimización del Programa de Mantenimiento Preventivo de la Autoridad de Acueductos y Alcantarillados Utilizando la Metodología Six Sigma
(Polytechnic University of Puerto Rico, 2014)
La metodología Six Sigma se utiliza
para optimizar el Programa de Mantenimiento
Preventivo de la Autoridad de Acueductos Y
Alcantarillados. Esta corporación que se clasifica
dentro de la industria de la manufactura ya ...
Design a Predictive Control Model for a CIP System
(Polytechnic University of Puerto Rico, 2014)
This document describes the analitical
method to define control parameters during a clean
in place (CIP) cicle in the pharamaceutical/food
industry. The new models of CIP systems comes
with many automatic controls and ...
Mejorar el Manejo de Materiales en Proyectos Utilizando Herramientas Lean
(Polytechnic University of Puerto Rico, 2014)
El proyecto consiste en mejorar el
manejo de materiales en los proyectos. Esto
implica que los materiales, sea de proyectos
capitales o proyectos rutinarios, se encuentran en
la necesidad del mismo programa. Es ...
Applying a Quality Risk Management Approach to a Cleaning Validation System
(Polytechnic University of Puerto Rico, 2014)
Cleaning Validation is a crucial step
on assuring product effectiveness and safety by
assuring that the equipment to be used has the
appropriate condition to manufacture a new
product without any foreign substances ...
Improvement of Receiving Department by a Digitalization Project in a Medical Devices Company
(Polytechnic University of Puerto Rico, 2014)
Years ago the word started to be more
aware with the environment. The companies
include in their planning be greener in order to
support this campaign. Parallel to this started what
many consider the third industrial ...