Buscar
Mostrando ítems 21-29 de 29
Anti-inflammatory Drug Elution Rate Variability Reduction
(Polytechnic University of Puerto Rico, 2013)
This project was focused in the Drug
Elution Rate Variability of an Anti-inflammatory
Drug used in a Medical Device Company. The
project is based on the manufacturing and bonding
process of a DXA Drug Collar that is a ...
Reduction of Cosmetic Defects Due to Criteria Misalignment at a Medical Device Manufacturing Line Using DMAIC Methodology
(2013)
For the last few years, the economy of
Puerto Rico has been negatively affected,
increasing the operational cost of the industries in
the Island. The Pharma / Medical Device industry
is not excluded of this situation. ...
Finished Goods Failure Reduction in a Wound Closure Medical Device Product Family
(Polytechnic University of Puerto Rico, 2013)
A corrective action and preventive
action plan was developed to address the increase
of Finished Goods failures in a wound closure
medical device product family. Following a DefineMeasure-Analyze-Improve-Control Six ...
Application of Lean Six Sigma Methodology to Optimize Fixation Device Assembly Line in the Medical Devices Industry
(Polytechnic University of Puerto Rico, 2013)
The research project was focused in the
line optimization of a Fixation Device assembly line
in a Medical Devices Industry. The Fixation Device
is called ProTack™. The Covidien Company is the
manufacturer located in ...
Medical Device Assembly Yield Improvement: Application of Quality Foundations
(Polytechnic University of Puerto Rico, 2013)
Quality foundations application is not a
new concept for medical device, manufacturing,
and service industries. The key quality concepts
have origins from the quality pioneers named as
“gurus” Joseph Juran, Deming and ...
Quality Improvement Process for Software Controls in Regulated Industry using Six Sigma Methodology
(Polytechnic University of Puerto Rico, 2013)
A regulated industry at medical
devices company, Software Control practices on
Automated Processes are weak and not
systematized. Several findings were found in past
internal audits related to software revision
changes. ...
Improving Steroid Out Of Specification (OOS) Trending on Pacemaker Lead
(Polytechnic University of Puerto Rico, 2013)
The purpose of this project is to
identify a roots cause and potential factors that
influencing Steroid Out Of Specification Results
(OOS) on pacemaker lead model XYZ. Project
involves Define, Measure, Analyze, Improve ...
Manufacturing Expert System Development Guidelines in a Medical Device Manufacturing Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - The medical device manufacturing company as well as other regulated industries can only perform manufacturing activities in a strictly controlled environment working area controlled by complex systems that ...
A Strategically Systematic Approach to Acquire Improvement Project Prospects in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - Numerous companies begin their manufacturing improvement journey lacking an overall game plan. This results in a not strategized and structured improvement implementation with results less than optimal and if ...