Buscar
Mostrando ítems 41-50 de 71
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Implementación de un Sistema Lean de Digitalización de Reportes en una Facilidad Universitaria
(Polytechnic University of Puerto Rico, 2016)
Se utiliza metodologías de Lean para
evitar el gasto excesivo de papeles, utilizados en la
impresión de los informes creados en la oficina de
Sistemas de Información. Este método conlleva que
las peticiones de los ...
Building your Businesses Performance using Quality Key Points
(Polytechnic University of Puerto Rico, 2016)
The problem with todays and
yesterday’s businesses is the lack of innovative
ideas because everything was build and presented
at the same time and not in stages. Today all you
see is what is left of what was once ...
Quality Management Applied on a Food Industry
(Polytechnic University of Puerto Rico, 2011)
Abstract – The research project was focused in transforming the quality engineering perspective from one that solves problems directed to engineers to one that solves routine problems that affects the entire society. ...
Lean Six Sigma: Process Improvement at Hospital X’s Emergency Department
(Polytechnic University of Puerto Rico, 2017)
The opportunity to establish and
outcome some frequently used industrial and
process engineering tools in a 28-bed, hospital
emergency department (ED), located in Puerto
Rico, was presented to CIRACET Corp. With ...
Reduction of Time in a Manufacturing Process for a Pharmaceutical Company Located in Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Abstract - The project is developed in a chemical plant of a pharmaceutical company in Puerto Rico. In 2011 the company had an increase in market demand of the active ingredient of one product. To ensure the profit plan, ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Design and Implementation of Lean Concepts in the HVAC Construction Industry
(Polytechnic University of Puerto Rico, 2017)
Construction Projects are always
unique, and risks rise from several different sources.
These situations bring new opportunities to improve
critical areas in a project. As a Project Management
approach, certain phases ...
Improving a Dialysis Center Construction Project: A Lean Perspective
(Polytechnic University of Puerto Rico, 2017)
Due to the necessity of the construction
of new facilities for healthcare, the Lean tools are
applied in a construction project. Specifically, in the
construction of a new facilities for a dialysis center,
to reduce ...
Research in the Requirements for Reducing the Blood Transfer Device Complains for Air Bubbles and Leakage
(Polytechnic University of Puerto Rico, 2017)
An increase on complain trigger a
company Quality department raising a flag for
further investigation of a product Nonconformance.
Using Lean Six Sigma tools and DMAIC
methodology a multidisciplinary team work together
to ...