Buscar
Mostrando ítems 141-143 de 143
Controlled Environmental Area Room B Relayout for Acuity X4 Subassemblies Manufacturing Line Transfer
(Polytechnic University of Puerto Rico, 2021)
Boston Scientific is part of a competitive environment and strives to find methods to reduce cost, waste and improve quality. A methodology for reduction is Lean manufacturing. This methodology is used to reduce “muda” ...
Optimizing Efficiency and Employee Satisfaction by Streamlining the Complaint Sample Request SOP of a Manufacturing Company Using Lean Methodology
(Polytechnic University of Puerto Rico, 2023)
In the Complaint department of a Manufacturing Company, the redundancy of documentation within the Standard Operating
Procedure (SOP) has emerged as a critical challenge. This redundancy is primarily manifested in the ...
Implementación de Lean y Seis Sigma para mejorar una celda de producción de neuroestimuladores
(Universidad Politécnica de Puerto Rico, 2020)
En el presente artículo se aborda un problema de una empresa de la industria de dispositivos médicos en República Dominicana que necesita aumentar el “throughput” de una línea de producción de neuroestimuladores en al menos ...