Buscar
Mostrando ítems 11-20 de 32
Process Time Reduction in Manufacturing Areas: Visual Valves Identification on Manufacturing Area specifically on Media Prep Area, Media Preparation tanks to Pursue Agility on the Visual inspections required before, during and after the Media Prep Solution are Prepared
(Polytechnic University of Puerto Rico, 2022)
Time of production process and associate activities were evaluated for Media Prep manufacturing process on Juncos, P.R. The voice of the customer requested reduced time inspection process before, ...
New flow route for the delivery of the to be cleaned filling equipment for the lot-to-lot changeover optimization using the lean manufacturing methodology
(Polytechnic University of Puerto Rico, 2022)
Management demand to reduce downtime in manufacturing had increased in recent years. This led manufacturing to use the Lean Methodology and Six Sigma tools to optimize the process. Focused on process improvement and ...
Improving the flow of Sampling Analysis of Manufacturing Batches to reduce time and Increase the Capacity of the Process
(Polytechnic University of Puerto Rico, 2022)
This research will focus on analyzing the flow of sample analysis of manufacturing batches to reduce time and increase the capacity of the process in the laboratories. A laboratory in the pharmaceutical industry receives ...
Lean Manufacturing Applied to In-Process Protein Concentration Determination Changing the Standard UV-Spectrometer for the Solo Variable Pathlength Extinction
(Polytechnic University of Puerto Rico, 2020)
The protein concentration test is a
complicated test, which requires a lot of time and
materials. Currently the test is being performed
using an old equipment of UV-Spectrometer
Visible. In this project, the researcher ...
Increase of Manufacturing Process Output
(Polytechnic University of Puerto Rico, 2020)
Haemonetics Puerto Rico, a medical
devices manufacturing site of blood filters,
identified that approximately the 11% of the
monthly plan of the manufacturing line #3 cannot
be made using the available manufacturing ...
Process Optimization by the Application of Lean Manufacturing Principles
(Polytechnic University of Puerto Rico, 2020)
Commercial demand at a
pharmaceutical facility in Juncos has been
constantly increasing since 2016. Focused on
process improvement strategies, our formulation
capabilities were increased to support Drug Product
requirements. ...
How the Different Visual Management Components Have an Impact on Developing a Lean Culture?
(Polytechnic University of Puerto Rico, 2020)
Vulnerable, uncertain, complex and
ambiguous environment surrounding companies,
makes difficult to ensure business continuity and
growth. Many companies have decided to deal with
such complexity by pursuing a Lean ...
Implementation of Lean Construction Method Depending on Generation Gap
(Polytechnic University of Puerto Rico, 2020)
The research project focuses on the
implementation of Lean Construction in two
construction companies where each owner belongs
to a different generation. Company A belongs to the
Baby Boomer generation while Company B ...
Reducing Downtime Due to Glove Breakage in Manufacturing Areas
(Polytechnic University of Puerto Rico, 2022)
Lean manufacturing was developed for maximizing resource utilization through the minimization of waste. During certain tasks in the Manufacturing Area, gloves tended to break. I propose that we need to reduce the walk ...
Using Six Sigma Methodology and Technology to Improve Quality Audit Process Cycle Time
(Polytechnic University of Puerto Rico, 2022)
Currently, at the “Pharmaceutical Company Y”, the cycle for launching a product can take an average of 46.7 days. The proposal for this study seeks to reduce this cycle time to 30 days. This project illustrates the ...