Buscar
Mostrando ítems 21-30 de 30
Anti-inflammatory Drug Elution Rate Variability Reduction
(Polytechnic University of Puerto Rico, 2013)
This project was focused in the Drug
Elution Rate Variability of an Anti-inflammatory
Drug used in a Medical Device Company. The
project is based on the manufacturing and bonding
process of a DXA Drug Collar that is a ...
Reduction of Cosmetic Defects Due to Criteria Misalignment at a Medical Device Manufacturing Line Using DMAIC Methodology
(2013)
For the last few years, the economy of
Puerto Rico has been negatively affected,
increasing the operational cost of the industries in
the Island. The Pharma / Medical Device industry
is not excluded of this situation. ...
Increase of Manufacturing Line Capacity using Lean Manufacturing on a Medical Device Company
(Polytechnic University of Puerto Rico, 2013)
The competition between Medical
Devices companies is increases every day. Many
medical devices companies are marketing products
that compete between each other. They challenged
to obtain long term contracts to supply ...
Application of Lean Six Sigma Methodology to Optimize Fixation Device Assembly Line in the Medical Devices Industry
(Polytechnic University of Puerto Rico, 2013)
The research project was focused in the
line optimization of a Fixation Device assembly line
in a Medical Devices Industry. The Fixation Device
is called ProTack™. The Covidien Company is the
manufacturer located in ...
Manufacturing Expert System Development Guidelines in a Medical Device Manufacturing Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - The medical device manufacturing company as well as other regulated industries can only perform manufacturing activities in a strictly controlled environment working area controlled by complex systems that ...
A Strategically Systematic Approach to Acquire Improvement Project Prospects in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - Numerous companies begin their manufacturing improvement journey lacking an overall game plan. This results in a not strategized and structured improvement implementation with results less than optimal and if ...
Validation of a New Procedure for a Pacemaker Component
(Polytechnic University of Puerto Rico, 2012)
Abstract - Company X manufactures pacemakers in Puerto Rico. Over the past years, Company X has been having a significant amount of complaints due to the septum component contained in its pacemakers. Doctors have claimed ...
Equipment Validation Standardization for Project Implementation Time Reduction of Automated Manufacturing Platforms
(Polytechnic University of Puerto Rico, 2012)
Abstract - Medical Device regulated industry requires extensive validation work. Using the latest automation technology for the process equipment to eliminate the operator interaction brings the challenge of how fast the ...
Increase Productivity in a Manufacturing Department of a Medical Devices Company
(Polytechnic University of Puerto Rico, 2013)
In all companies the productivity is a
very important metric because is the way to make
sure that we optimize our resources and time. Is the
way to measure if we are manufacturing as
expected and with the required ...
The Increase of Machine Utilization, using SMED, a Lean Manufacturing Tool
(Polytechnic University of Puerto Rico, 2013)
In this project we will see the
application of SMED (Single Minute Exchange
Dye) a Lean Manufacturing tool in the Medical
Device Industry, and how it helps to reduce the
time of changeover in a machine. One of the
benefits ...