Buscar
Mostrando ítems 61-70 de 143
Mejora de Manejo Visual para el Almacenamiento de Muestras Parenterales en los Laboratorios de Control de Calidad
(Polytechnic University of Puerto Rico, 2018)
En los laboratorios de bioquímica se
están experimentando problemas al momento de
realizar análisis y no encontrarse las muestras en
la nevera. Esta situación afecta gravemente la
productividad del laboratorio, ya que ...
Quality Management Applied on a Food Industry
(Polytechnic University of Puerto Rico, 2011)
Abstract – The research project was focused in transforming the quality engineering perspective from one that solves problems directed to engineers to one that solves routine problems that affects the entire society. ...
Optimización en el Proceso de Manejo de Materiales para las Operaciones Técnicas
(Polytechnic University of Puerto Rico, 2017)
Era utilizada la metodología de Lean
para reducir el costo de inversión en la compra de
materiales de instalación para los procesos de
operaciones técnicas. Este método está basado en
reducir considerablemente el alto ...
Implementing Lean Manufacturing to the Breaker X Final Assembly Line
(Polytechnic University of Puerto Rico, 2011)
Abstract - Lean manufacturing is a practice based on preserving the value of a product or service, with the minimum work and materials required to complete it. It is derived from the Toyota Production System and concentrates ...
Optimization of Backorders Processing using Lean Principal
(Polytechnic University of Puerto Rico, 2017)
In this article we discuss the
optimizations made in the area of drugs controlled
specifically in the narcotics vault, in a distribution
center. The distribution center dispatches narcotic
pharmaceutical products for ...
Design and Implementation of Lean Concepts in the HVAC Construction Industry
(Polytechnic University of Puerto Rico, 2017)
Construction Projects are always
unique, and risks rise from several different sources.
These situations bring new opportunities to improve
critical areas in a project. As a Project Management
approach, certain phases ...
Services Repair Optimization in a Subcontractor Company Applying Lean- 6 Sigma
(Polytechnic University of Puerto Rico, 2011)
Abstract ⎯ Increasing competition between industries forced their services to expand to other countries out of their territorial limits. Job cost, planning and quality are the keys to success. This project measured, ...
Implementation of Lean Six Sigma in a Manufacturing Cell of Orthopedic Devices to Reduce Waste
(Polytechnic University of Puerto Rico, 2012)
Abstract - Lean practices with Six Sigma methodology has been successfully applied in many industries to ensure the reduction of wastes and improve product quality. In this case study, the proposed implementation of lean ...
Applying Lean Manufacturing to Minimize Inspection Time in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - This research is conducted in medical devices manufacturing company that makes a product to be used on the treatment of female stress urinary incontinence resulting from urethral hyper mobility and intrinsic ...
Implementing Quality Management Techniques into a Dental Office for Improving Performance of the Operations
(Polytechnic University of Puerto Rico, 2012)
Abstract - The objective of this research is to improve operations of a dental office by the application of Quality techniques. In this research, the performance of the actual process was evaluated and categorized to achieve ...