Suche
Anzeige der Dokumente 21-30 von 344
Validation of a New Procedure for a Pacemaker Component
(Polytechnic University of Puerto Rico, 2012)
Abstract - Company X manufactures pacemakers in Puerto Rico. Over the past years, Company X has been having a significant amount of complaints due to the septum component contained in its pacemakers. Doctors have claimed ...
Vision System Selection Requirements & Implementation In Industrial Automation
(Polytechnic University of Puerto Rico, 2012)
Abstract - The vision systems are part of a new revolution in automation. With the capability of
being implemented practically to any application, the benefit of using this kind of systems are multiple but the ones which ...
Implementing a Preventive Maintenance to Complement Standards 6.3 and 7.1 of ISO 9001:2008
(Polytechnic University of Puerto Rico, 2012)
Abstract - The recycling process turns materials that would otherwise become waste into valuable resources, and it’s know many companies around the world do this process to produce a raw material that will be used to create ...
Increase Productivity in a Manufacturing Department of a Medical Devices Company
(Polytechnic University of Puerto Rico, 2013)
In all companies the productivity is a
very important metric because is the way to make
sure that we optimize our resources and time. Is the
way to measure if we are manufacturing as
expected and with the required ...
Manufacturing Process Continuous Flow Implementation with Quality Control Inspection and Bill of Material Standardization in a Medical Devices Company
(Polytechnic University of Puerto Rico, 2012)
The Manufacturing Area was composed of seventeen (17) product families around 191 Stock Keeping Units. Most of these families were manufactured in batch mode, while others in continuous flow. This project improved the value ...
Production Line Improvement Using DMAIC Tool in an Electrical Production Plant
(Polytechnic University of Puerto Rico, 2010)
Today, there is much competition between
the manufacturers of electronics products. This
creates a need for the manufacturers to develop
processes that can supply the client demand within
a required time and a specified ...
Design of a Cleaning Change Over Reduction Strategy for a High Volume Product in a Packaging Line
(Polytechnic University of Puerto Rico, 2010)
Currently packaging operations are
trying to reduce the downtime and operational cost
among others activities to enhance efficiency and
overall process performance. Based on this
objective, pharmaceutical packaging ...
Reliability of Operators performing the Visual Inspection of Parenteral Drug Products
(Polytechnic University of Puerto Rico, 2010)
The visual inspection of parenteral
product filled vials is performed to assure that any
damaged or defective unit is detected and removed
prior to packaging. This investigation evaluated
the visual inspection process ...
Improvements to Perfusion Skids 66501/66502/66503 Operations Used for Enbrel Product in AML-06
(Polytechnic University of Puerto Rico, 2020)
Amgen AML-06 Drug Product Plant is
a multi-product facility where therapies for chronic
diseases are manufactured. Its systems are
designed for the continuous improvement of the
processes, in order to comply with the ...
Global Supplier Quality Performance Monitoring Scorecard
(Polytechnic University of Puerto Rico, 2020)
Monitoring the performance of
suppliers in any industry ensures the continuous
improvement of the relationship between a
supplier-customer through the identification of
gaps between the current performance and the
customer ...