How to Reduce the Confirmation Period of Possible Critical Defects Detected During the Quality Assurance Acceptance Sampling Plan for Inspected Drug Product
Abstract
An Acceptance Sampling Plan, or ASP,
is a Quality attributes assessment performed during
the manual or automated inspection of Drug
Products. After inspection, the inspected product
then becomes an Inspected Drug Product, or IDP.
During the ASP, if any critical defect is identified
during inspection, it is segregated for further On
the Floor Testing (OFFT) or Process Development
(PD) evaluation for additional confirmation. The
main focus of this project is how to reduce this
confirmation period by implementing portion
segregation during the inspection process and
sending the defective unit(s) for further evaluation
as soon as the portion is completed, instead of
waiting for the culmination of the batch inspection
process. This implemented modification in current
standard operating procedures, reduces the wait
period by performing the defect confirmation
parallel to the on-line inspection process, thus
avoiding delays in the product’s final disposition.
Key Terms ⎯ acceptance sampling plan,
critical defect, on-the-floor forensic testing, process
development